2) load shifting
削峰填谷
1.
Determination and analysis of TOU power price based on DSM when load shifting optimized;
削峰填谷最优时基于DSM分时电价的确定与分析
2.
It can accomplish the goal of load shifting and reducing co.
作为用户侧电价的一种,分时电价目前在世界各国得到了广泛的应用,而且分时电价是需求侧管理的一种重要手段,可以达到削峰填谷与减少用户购电费用的目的。
4) peak load shifting
移峰填谷
1.
Autocontrol technology of peak load shifting in electrolyzers;
隔膜碱电解槽移峰填谷自动控制技术
2.
Evaluation and spot test of peak load shifting ability for cold storage regenerator system;
蓄冷空调项目电力移峰填谷效果评价及现场测试
3.
Electric heat-storage boiler technology and the evaluation method of its peak load shifting effect;
蓄热电锅炉技术及其移峰填谷效果的评价方法
5) filling valley and modulating peak
填谷调峰
1.
Pumped-storage power plants can undertake the tasks of filling valley and modulating peak.
抽水蓄能电站具有填谷调峰的优良特性。
6) peaking and valley-filling
调峰填谷
1.
After the completion of the project of power transmission from west to Guangdong, the Guangdong Province should construct a number of pumped storage power plants in order to guarantee the safe and stable operation and the needs of peaking and valley-filling of the Guangdong Power Network and to .
上述电力送广东后 ,为保证广东电网的安全稳定运行及调峰填谷需要 ,在广东应相应建设一定数量的抽水蓄能电站与其配套 ,以发挥最佳的经济效益。
补充资料:峰谷
分子式:
CAS号:
性质: 吸收光谱中两个极大吸收峰间的最小吸收波长。物质在此区间对光的吸收较小,一般不能作为定量的波长。
CAS号:
性质: 吸收光谱中两个极大吸收峰间的最小吸收波长。物质在此区间对光的吸收较小,一般不能作为定量的波长。
说明:补充资料仅用于学习参考,请勿用于其它任何用途。
参考词条