1)  vacuum method wellpoint
真空预压法井点
2)  vacuum preloading method
真空预压法
1.
Application of vacuum preloading method treating soft soil foundation in road engineering;
真空预压法在道路工程软基处理中的应用
2.
The Field Experiment and Theory Study of Vacuum Preloading Method on Soft Soil Foundation;
真空预压法加固软土地基的现场试验与理论研究
3.
Looking back over the development actuality for Chinese vacuum preloading method in recent years,the paper discusses the suspending-pump standard for the vacuum preloading.
回顾了近年来我国真空预压法的发展现状,论述了真空预压的停泵标准,介绍了新型排水材料的发展和真空预压联合技术的发展,并对真空预压法进行了展望,为进一步研究真空预压处理软基技术提供了参考。
3)  vacuum preloading
真空预压法
1.
Constructing control of ground treatment of soft solid by vacuum preloading;
真空预压法加固软基的控制要点探讨
2.
Construction technique of strengthening soft foundation by vacuum preloading method and its amelioration;
真空预压法加固软基施工工艺及其改进
3.
According to the practical soft foundation treatment project of Hexi Development Zone in Nanjing,reinforcement mechanisms of surcharge preloading and vacuum preloading are analyzed.
结合南京市河西开发区中软土地基处理的实际工程,分析了堆载预压法和真空预压法的加固机制,比较了二者在施工工艺和加固效果上的异同,为合理的选择不同的软基处理方式提供了科学的依据。
4)  vacuum well point dropping heaped combined pre compression
真空井点降水堆载联合预压
1.
The practice proves that even if the stage of the construction is not so sufficient, provided the application is proper, the heaped pre compression method and vacuum well point dropping heaped combined pre compression method can effectively redu.
本文结合实际工程论述了堆载预压法和真空井点降水堆载联合预压法加固软土地基的设计、施工技术与经验。
5)  vacuum well point
真空井点
6)  vacuum point well
真空点井
1.
Questions existed in the designing and constructing of the vacuum point well in dewatering engineering are discussed based upon the newly issued Technical Code for Groundwater Lowering Engineering in Building and Municipal (JGJ/C111-98).
就降水工程中真空点井的设计和施工中存在的一些问题 ,结合新近颁发的《建筑与市政降水工程技术规范》(JGJ/Cll 98)加以论述 ,指明了工程中现有成规的几点不合理之
补充资料:预压法
      对软土地基预先加压,使大部分沉降在预压过程中完成,相应地提高了地基强度。预压法适用于淤泥质粘土、淤泥与人工冲填土等软弱地基。预压的方法有堆载预压和真空预压两种。
  
  堆载预压  在地基上堆放重物(水、土、砂、石等)进行预压。当堆载超过计划建造的建筑物荷载时,称为超载预压。为了防止堆载时压坏地基,需分级加载,即:在前一级荷载作用下地基基本固结后,再施加下一级荷载,直至达到设计荷载为止。
  
  预压所需时间的长短取决于地基土层的渗透特性、厚度和预压荷载的大小等因素。这些因素可以根据地基固结理论进行计算预计。施工时应监测地面沉降和土中孔隙水压力的消散情况,对预压加以控制。
  
  为了加速厚层软土的固结,缩短预压时间,应设法改善厚层软土的排水条件。最常用的排水的方法是在地基中按一定间距作孔,孔内填砂以形成砂井(图1)。然后在地面加铺砂垫层加以沟通。近年来,土工织物日益发展,已开始采用纤维编织的袋装砂井和在排水纸板上发展起来的塑料板排水。
  
  
  堆载预压早在50年代就广泛地应用于铁路、公路路堤、码头和岸坡的地基处理;还应用于土坝、水闸、房屋、冷藏库和油罐等工程的软基处理。如中国的苏北大浦和汉江杜家台两个大型水闸工程,经过预压后,大大减少了闸室和岸墩的沉降量;又如上海地区采用3万米3油罐充水预压改良地基,取得了显著效果。
  
  真空预压  以大气压作为预压荷载(图2),对地基土进行抽气,在土中造成一定的真空度,形成大气压力与真空压力的差值作用,将土中一部分水抽出,从而使地基土固结而加固。如果设置排水砂井,还可将孔隙内的水加速排出。
  
  
  此法首先由瑞典皇家地质学院于1952年提出。到80年代,中国也进行了室内外试验,并且已经开始在工程中应用。
  