说明:双击或选中下面任意单词,将显示该词的音标、读音、翻译等;选中中文或多个词,将显示翻译。
您的位置:首页 -> 词典 -> 验收试航
1)  acceptance trial trip
验收试航
2)  acceptance test trial
验收试车验收试航
3)  acceptance test
验收试验
1.
Turbine model and model acceptance test for Longtan Hydropower Station;
龙滩水电站水轮机模型及验收试验
2.
The rationality and necessity of specification for safety factor,acceptance test and qualification of anchor in the ground anchorage standards of China,America,British and Japan are discussed.
描述了中国、美国、英国、日本等国的岩土锚杆标准中关于锚杆设计安全系数、验收试验及锚杆合格条件规定的合理性和必要性。
3.
The conclusion of the acceptance test is that both the behaviors of the model t.
为了验证瀑布沟水电站水轮机模型的水力性能,进行了模型验收试验。
4)  accept in water transport
通航验收
5)  sea trial
实航试验
1.
To solve the problem that passive homing of lightweight torpedo can not pursue target in sea trial,the fault in sea trial and the torpedo performance were analyzed and compared.
针对轻型鱼雷实航试验中被动自导难以跟踪到目标,其功能未得到充分考核的问题,通过对实航中故障现象和性能参数进行分析比较,找出了问题产生的原因,即试验中的电干扰导致被动自导难以跟踪目标,幅度门非正常开启造成被动跟踪过程中丢失目标。
2.
Because there are some variables in torpedo′s system configurations during sea trial,the traditional method for torpedo reliability evaluation is no longer applicable by directly using all of the reliability information of torpedo from sea trial.
在鱼雷可靠性鉴定试验中,部分实航鱼雷的系统配置是变化的,直接用全雷实航试验信息进行可靠性评定的方法已不适用。
6)  self-propulsion test
自航试验
1.
Model test methods and advantages of several existing podded propulsors are presented,as well as the issues that should be taken account of in open water and self-propulsion tests.
文章介绍了吊舱式推进器的特点,分析了目前几种主要的吊舱推进器的模型试验方法及其特点,提出了在敞水、自航试验中需要关注的问题。
2.
Focusing on the interaction among the screws,the paper analyzed the current method of determining propulsive factor based on ship s self-propulsion test with three-screw and presented a new method to test and analyzed propulsive factor of ship with multi-screw.
针对多桨船螺旋桨间互相干扰的影响,通过对三桨船自航试验推进因子分析方法进行分析探讨,提出新的三桨及以上的多桨船船模自航试验方法和其推进因子分析方法。
3.
Methods of the ship model self-propulsion test in regular waves,the data processing and expression of the frequency response curves of self-propulsion factors in the regular waves,the spectrum analysis statistics prediction of power in irregular waves and the prediction of ship speed loss in irregular waves are described.
阐述了船模规则波自航试验的方法、规则波中自航因子频率响应曲线的数据整理和表达方法、不规则波中收到功率的谱分析统计预报方法,并给出了不规则波中船舶的失速预报方法。
补充资料:承包人要求发包人组织工程验收,包括隐蔽工程的验收和工程竣工的验收的权利
承包人要求发包人组织工程验收,包括隐蔽工程的验收和工程竣工的验收的权利:根据我国《合同法》的第278条规定隐蔽工程在隐蔽以前,承包人应当通知发包人检查。发包人没有及时检查的,承包人可以顺延工程日期,并有权要求赔偿停工、窝工等损失。根据《合同法》第279条中的规定建设工程竣工后,发包人应当根据施工图纸及说明书、国家颁发的施工验收规范和质量检验标准及时进行验收,因此在工程完成时组织竣工验收,也是发包人的主要义务。建设工程竣工验收合格后,方可交付使用,未经验收或者验收不合格的,不得交付使用,发包人对未经验收的工程,提前使用或者擅自动用的,对发现的质量问题由发包人自行承担责任。-------------《民法》第一版,第514页。魏振瀛;《合同法》的第278条
说明:补充资料仅用于学习参考,请勿用于其它任何用途。
参考词条