1) acceptance test trial
验收试车验收试航
2) acceptance trial trip
验收试航
3) acceptance trial
验收试车
4) acceptance test
验收试验
1.
Turbine model and model acceptance test for Longtan Hydropower Station;
龙滩水电站水轮机模型及验收试验
2.
The rationality and necessity of specification for safety factor,acceptance test and qualification of anchor in the ground anchorage standards of China,America,British and Japan are discussed.
描述了中国、美国、英国、日本等国的岩土锚杆标准中关于锚杆设计安全系数、验收试验及锚杆合格条件规定的合理性和必要性。
3.
The conclusion of the acceptance test is that both the behaviors of the model t.
为了验证瀑布沟水电站水轮机模型的水力性能,进行了模型验收试验。
5) tory acceptance test
工厂验收试车
6) performance test
验收测试
1.
Problem discussion of performance test of CEMS in coal-fired power plant;
燃煤电厂烟气排放连续监测系统验收测试问题探讨
2.
Correlative regulations of International Standard ISO and USA EPA about performance test of CEMS are illustrated simply.
简述了ISO标准和美国EPA关于烟气排放连续监测系统验收测试的相关规定,并详细介绍了我国燃煤电厂烟气排放连续监测系统验收测试方法。
补充资料:承包人要求发包人组织工程验收,包括隐蔽工程的验收和工程竣工的验收的权利
承包人要求发包人组织工程验收,包括隐蔽工程的验收和工程竣工的验收的权利:根据我国《合同法》的第278条规定隐蔽工程在隐蔽以前,承包人应当通知发包人检查。发包人没有及时检查的,承包人可以顺延工程日期,并有权要求赔偿停工、窝工等损失。根据《合同法》第279条中的规定建设工程竣工后,发包人应当根据施工图纸及说明书、国家颁发的施工验收规范和质量检验标准及时进行验收,因此在工程完成时组织竣工验收,也是发包人的主要义务。建设工程竣工验收合格后,方可交付使用,未经验收或者验收不合格的,不得交付使用,发包人对未经验收的工程,提前使用或者擅自动用的,对发现的质量问题由发包人自行承担责任。-------------《民法》第一版,第514页。魏振瀛;《合同法》的第278条
说明:补充资料仅用于学习参考,请勿用于其它任何用途。
参考词条