说明:双击或选中下面任意单词,将显示该词的音标、读音、翻译等;选中中文或多个词,将显示翻译。
您的位置:首页 -> 词典 -> 验收试飞
1)  acceptance test flight,witnessed by coutomer; acceptance trials,by military user
验收试飞
2)  flight-approval
验收飞行试验
3)  acceptance flight
验收飞行
4)  flight test
飞行试验
1.
Flight test investigation for an integrated ducted rocket;
整体式固体火箭冲压发动机飞行试验
2.
Research on JL8 aircraft stall and spin flight test;
JL8飞机失速尾旋飞行试验研究
3.
The design and implementation of flight test management system;
飞行试验管理系统的设计与软件实现
5)  flight testing
飞行试验
1.
In flight testing, some real-time parameters are transmitted in PCM format to ground telemctry station for processing and displaying.
从系统设计的角度出发,针对飞行试验多路PCM遥测数据,论证了利用通信卫星技术实现超远距数传的有关问题。
6)  flight experiment
飞行试验
1.
The integration and flight experiment of UAV remote sensing system;
无人机遥感系统的集成与飞行试验研究
2.
To solve the attitude control problem,a multi-sensor fusion and attitude control algorithm is developed and applied to flight experiment.
基于嵌入式计算机和MEMS传感器技术,构建了一个小巧的低成本飞行控制系统;针对微小型直升机的姿态控制问题,提出了一种基于多传感器测量的姿态数据融合方法和姿态控制算法,并进行了飞行试验研究,同时探讨了初期试验阶段的实用安全装置和方法,给出了单自由度、三自由度和系留飞行姿态控制试验的结果与分析。
3.
A scene matching navigation experiment system(SMNES)software has been developed for a practical flight experiment in Reference[1].
文献[1]为实际飞行试验研发出一种景像匹配导航试验系统(Scene Matching Navigation ExperimentSystem,SMNES)软件,为了对该软件的功能进行全面检测,文中给出了 SMNES 的硬件设计,讨论了系统软件的设计,同时还介绍了飞行试验的内容、试验方法及试验结果。
补充资料:承包人要求发包人组织工程验收,包括隐蔽工程的验收和工程竣工的验收的权利
承包人要求发包人组织工程验收,包括隐蔽工程的验收和工程竣工的验收的权利:根据我国《合同法》的第278条规定隐蔽工程在隐蔽以前,承包人应当通知发包人检查。发包人没有及时检查的,承包人可以顺延工程日期,并有权要求赔偿停工、窝工等损失。根据《合同法》第279条中的规定建设工程竣工后,发包人应当根据施工图纸及说明书、国家颁发的施工验收规范和质量检验标准及时进行验收,因此在工程完成时组织竣工验收,也是发包人的主要义务。建设工程竣工验收合格后,方可交付使用,未经验收或者验收不合格的,不得交付使用,发包人对未经验收的工程,提前使用或者擅自动用的,对发现的质量问题由发包人自行承担责任。-------------《民法》第一版,第514页。魏振瀛;《合同法》的第278条
说明:补充资料仅用于学习参考,请勿用于其它任何用途。
参考词条