1)  general engineer; chief engineer
总工程师
2)  Chief engineer responsibility system
总工程师责任制
3)  chief design engineer
设计总工程师
4)  port engineer,superintendent engineer
造船公司总工程师
5)  Total Time Limit
总工期
1.
Approach Optimized Discussing of Total Time Limit of Project in Building Highroad and Bridge in Contract Condition;
合同环境下优化路桥项目施工总工期之方法探讨
2.
SEC,as the side design,has to plan the total time limit for the owner,and on this basis,makes distribution of human resources,estimation of unpredictable and price difference,plan project cash flow and compare technology economy.
工程建设公司作为设计方,需为业主策划工程建设的总工期,并在此基础上进行人力资源分配、不可预见和价差测算、项目现金流曲线的规划、技术经济的比较等工作。
6)  population efficiency ratio
总工效比
1.
The maximum of population efficiency ratio is achieved by the route good used and the optimal production scheme is obtained through succesive adjustment range between outputs in this paper.
本文利用总工效比最大的路径通过逐步调整产量间的极差得到了最优生产方案。
参考词条
补充资料:陈师道宰乌程县
【诗文】:
尝闻太丘长,德不负公卿。
墟暮今千载,昆云亦一城。
本怀深闭蓄,余论略施行。
故自有仁政,能传家世声。



【注释】:



【出处】:
说明:补充资料仅用于学习参考,请勿用于其它任何用途。