说明:双击或选中下面任意单词,将显示该词的音标、读音、翻译等;选中中文或多个词,将显示翻译。
您的位置:首页 -> 词典 -> 验收<测>
1)  acceptance test
验收<测>
2)  acceptance monitoring
验收监测
1.
Application of photobacterium phosphoreum toxicity test on the environmental protection acceptance monitoring at project completion;
发光菌毒性试验在项目竣工环保验收监测中的应用
2.
The noise acceptance monitoring plays an important role in the environmental protection acceptance for construction project.
建设项目噪声验收监测,是建设项目竣工环境保护验收的重要组成部分。
3.
From a managerial point of view,the basic condition of acceptance monitoring is put forward in the end.
阐述了宾馆行业在环保设施竣工验收监测中应采取的关键步骤、运营过程中污染物的来源,提出了合理的监测因子和监测时段;同时从管理的角度,提出了验收监测应具备的基础条件。
3)  performance test
验收测试
1.
Problem discussion of performance test of CEMS in coal-fired power plant;
燃煤电厂烟气排放连续监测系统验收测试问题探讨
2.
Correlative regulations of International Standard ISO and USA EPA about performance test of CEMS are illustrated simply.
简述了ISO标准和美国EPA关于烟气排放连续监测系统验收测试的相关规定,并详细介绍了我国燃煤电厂烟气排放连续监测系统验收测试方法。
4)  acceptance test
验收检测
1.
Study of the acceptance tests for the modern medical equipment;
大型医疗设备验收检测机制的研究
2.
5, the several clauses for these standards, such as terms and definitions, requirements for metrological characteristic, acceptance tests and reverification tests and applications and so on, are discussed.
5(送审稿)的基础上,对具有接触探测系统CMM验收检测和复检检测标准中的术语和定义、计量特性要求、验收检测和复检检测、应用等若干问题进行了探讨,并提出了具体修改建议。
5)  acceptance testing
验收测试
1.
This paper is mainly discussing the merits, defects and applicable case of unit testing, integration testing and acceptance testing during software development.
本文着重讨论了在SDLC过程中单元测试、集成测试以及验收测试的优缺点和适用情况。
6)  measurement and acceptance
验收测量
1.
Through overall analysis of error of measurement and acceptance at open pit mine of Jinduicheng Molybdenum Industry Corporation, the precision of measurement of mine rock were assessed, suggestions for raising the precision of measurement were put forward, which is reference to similar mine at the home and abroad.
通过对金堆城钼业公司露天矿山验收测量误差的全面分析 ,评定了矿岩量的测量精度 ,提出了提高精度的几点建议 ,对国内外同类矿山的测量管理有参考价值。
补充资料:承包人要求发包人组织工程验收,包括隐蔽工程的验收和工程竣工的验收的权利
承包人要求发包人组织工程验收,包括隐蔽工程的验收和工程竣工的验收的权利:根据我国《合同法》的第278条规定隐蔽工程在隐蔽以前,承包人应当通知发包人检查。发包人没有及时检查的,承包人可以顺延工程日期,并有权要求赔偿停工、窝工等损失。根据《合同法》第279条中的规定建设工程竣工后,发包人应当根据施工图纸及说明书、国家颁发的施工验收规范和质量检验标准及时进行验收,因此在工程完成时组织竣工验收,也是发包人的主要义务。建设工程竣工验收合格后,方可交付使用,未经验收或者验收不合格的,不得交付使用,发包人对未经验收的工程,提前使用或者擅自动用的,对发现的质量问题由发包人自行承担责任。-------------《民法》第一版,第514页。魏振瀛;《合同法》的第278条
说明:补充资料仅用于学习参考,请勿用于其它任何用途。
参考词条