1.
Discussions on Monitoring on Environmental Protection Construction Project for Check and Accept of Completed Project
建设项目竣工环境保护验收监测工作探讨
2.
Quality Control in Acceptance Check Monitoring Site for Wastewater Treatment Installations
废水处理设施验收监测现场的质量控制
3.
Reconsideration of Environmental Check & Acceptance to the Completion of Project
建设项目竣工环保验收监测缺陷的再认识
4.
Reconsideration on Environmental Check&Acceptance to the Completion of Project
建设项目竣工环保验收监测工作的再认识
5.
The determination of monitoring site, monitoring factors and frequency in environmental protection acceptance check monitoring for construction project were discussed.
概述了建设项目竣工环境保护验收监测点位的布设、监测因子的选择及监测频次的确定。
6.
and 57 construction projects are being monitored for acceptance (15 of them are ecological construction projects).
正在开展验收监测的建设项目共57个(其中生态类建设项目15个)。
7.
Problems in Environmental Protection Check and Accept Monitoring of Project Complete
建设项目竣工环境保护验收监测存在问题的分析与建议
8.
This paper analyzes the existing issues with monitoring of acceptance check for completed construction projects, and proposes suggestions on countermeasures.
分析了竣工验收监测工作中存在的问题 ,提出了对策建议。
9.
The Compileing of Monitoring Report on Environmental Protection for Check and Accept of Completed Project of Nuclear Technology Application
浅谈核技术应用项目竣工环保验收监测报告的编制
10.
PROJECT COMPLETION AND ACCEPTANCE OF ENVIRONMENTAL PROTECTION,MONITORING,SOME EXPERIENCE
建设项目环境保护竣工验收监测工作中的几点体会
11.
The Task and Countermeasures of Current Situation on Environmental Monitoring for Examination and Acceptance of the Newly Completed Source in Environmental Management
建设项目竣工环境保护验收监测在环境管理中的任务与对策
12.
Discussion of Problems on Monitoring Report Preparation for Environmental Acceptance Checking
项目竣工环境保护验收监测报告编制中若干问题的探讨
13.
Problems of Environmental Protection Inspection and Acceptance Construction Project of Municipal Domestic Waste Incineration
危险废物焚烧项目竣工环保验收监测中应注意的问题
14.
Comparison Monitoring in Check and Acceptance for Continuous Emission Monitoring System(CEMS) of Pollution Sources
污染源在线监测系统(CEMS)的验收比对监测
15.
Supervise commissioning of instrumentation and final loop acceptance testing.
监管仪表调试以及仪表控制回路最终测试验收。
16.
Every day the laboratory collects samples to monitor the water quality in Ago Bay.
每天,实验室都要在AGO BAY收集样品,监测水质。
17.
The environment/safety monitoring and measurement report;three simultaneous check and acceptance report;
环境/安全监测报告;环境/安全"三同时"验收报告
18.
Experimental Research and Practical Discussion of COD Monitoring with UV Absorption Spectrum;
紫外吸收法COD监测技术的实验研究及应用探讨