1) nitrosalol
硝基萨罗
2) pheno-sal
乙酰氨基萨罗
3) salol, phenyl salicylate
萨罗
4) Sarotherodon melanotheron
萨罗罗非鱼
1.
Microsatellite marker analysis of genetic variation in the backcross progenies from Oreochromis niloticus and Sarotherodon melanotheron;
尼罗罗非鱼与萨罗罗非鱼回交子代遗传变异的微卫星分析
2.
Evaluation of growth,salt tolerance and parents heterosis contribution in reciprocal hybrids F_2 between Oreochromis niloticus and Sarotherodon melanotheron;
尼罗罗非鱼与萨罗罗非鱼正反交鱼自繁后代F_2耐盐性、生长性能及亲本对杂种优势贡献力的评估
3.
AFLP fingerprinting of the introduced stock of Sarotherodon melanotheron in China;
我国引进萨罗罗非鱼群体的AFLP遗传指纹
5) Florence
[英]['flɔrəns] [美]['flɔrəns]
佛罗伦萨
1.
The Secularization Tendency of Florence Drawing in the 14th and 15th Century;
14、15世纪佛罗伦萨绘画艺术的世俗化倾向
2.
The Decline of Florence s Textile Industry in Renaissance;
试探文艺复兴时期佛罗伦萨毛织业衰落的原因
3.
Shallowly discusses Florence the trousseau fund policy;
浅谈佛罗伦萨的嫁妆基金政策
6) Xylophone
[英]['zaɪləfəʊn] [美]['zaɪlə'fon]
萨罗风(Xylophone)
补充资料:萨尔达尔萨罗瓦尔坝
萨尔达尔萨罗瓦尔坝 |
SardarSarovar Dam |
概 述 |
萨尔达尔萨罗瓦尔坝位于印度古吉拉邦讷尔默达(Narmada)河上,是一项多目标开发工程。主坝为混凝土重力坝,最大坝高163m,水库总库容95亿m3,水电站装机145万kW,总灌溉面积179.2万hm2,并为4720个乡村和131个以上的城镇提供生活和工业用水。工程于1988年开工。 |
枢纽布置 |
枢纽主要建筑物包括:主坝、地下水电站、主溢洪道、辅助溢洪道、渠首水电站等。 大坝坝顶长1210m,坝轴线为弧形,曲率半径为7600m,以利用各坝段之间剪力,增加大坝的抗滑稳定性。主坝体积为670万m3。 主河槽中设置有23孔闸门的主溢洪道,闸门尺寸为18.3m×16.76m。主溢洪道的泄流能力为70394m3/s,主溢洪道左侧设置有7孔闸门的斜槽式辅助溢洪道,闸门尺寸为18.3m×18.3m,泄流能力为21597m3/s,在最高水位为140.21m时,总泄量为90100m3/s。可以通过千年一遇的洪水,并留有充足的安全余量。主溢洪道的消能工采用斜坡接水平护坦的消力池,斜坡和护坦上设有隔墙,23孔闸共有4道隔墙,防止产生横向水流;辅助溢洪道斜槽末端与滑雪式消力戽相接。 右岸地下水电站安装6台可逆混流式水轮发电机组,单机容量20万kW。右岸渠首式电站安装5台常规转浆式水轮发电机组,单机容量为5万kW。 在右岸建筑一条长460km的干渠。该渠道在渠首处的引水量为1133m3/s,是当今世界上最大的渠道。它在古吉拉特-拉贾斯坦边界处的过流能力将逐渐减小到71m3/s。有35条长渠从干渠分出,配水系统网络的总长度约为75000km。为了经济地利用昂贵和数量不多的灌溉用水,采用半自动遥控方法进行定量供水。 |
其 他 |
1.坝基处理 对坝基断层采取挖除破碎岩石回填混凝土处理。上游端挖到-16.5m高程,下游端挖到-6.5m高程,混凝土塞整体浇至18m高程,塞内设有检查廊道,上面设有2层钢筋网,钢筋直径36mm,间距250mm以承受不均沉陷产生的拉应力。对左岸28~42号坝段基础中的红玄武岩土层和右岸44~51号坝段基础中的粘土质砂岩采用抗剪键网处理。顺这些岩层开挖平洞,平行坝轴线至少10条,垂直于坝轴2条,组成网格,平洞高4.5m,宽度根据地质情况决定。开挖后回填混凝土。上、下层网格位置最好相对应。 |