说明:双击或选中下面任意单词,将显示该词的音标、读音、翻译等;选中中文或多个词,将显示翻译。
您的位置:首页 -> 词典 -> 脱模制
1)  release agent
脱模制
2)  forced demoulding
强制脱模
1.
If the lateral uplift has enough distortion space, it could be forced demoulding.
给侧向凸起留出足够的变形空间,可强制脱模。
2.
And the mechanisms of forced demoulding, two_time ejection and delayed ejection by a sliding core used in the injection mould were introduced.
分析了沐浴露瓶盖的工艺特点 ,介绍了瓶盖注射模的结构及工作过程 ,并介绍了注射模设计中采用的强制脱模、二次顶出、滑动型芯延时顶出机构等。
3.
The structure characteristics and working process of the mechanisms for 3_time ejection, forced demoulding, delayed kicking out the sliding core adopted in the design of the injection mould for the lid of the lotion bottle were introduced.
介绍了洗面奶瓶盖注射模设计中所采用的3次顶出、强制脱模、滑动型芯延时顶出等机构的结构特点及工作过
3)  mould-release preparations
脱模制剂
4)  forced demolding
强制脱模
1.
The combined application of two-stage ejection and forced demolding in injection mold
注塑模中二次顶出、强制脱模的联合应用
5)  forced demolding
强制脱模量
6)  Ejection of Injection Molded Products
注塑制品脱模
补充资料:JIT准时制生产(及时制生产)

JIT准时制生产(及时制生产):是应用拉引式生产物流控制原理的方法。在生产系统中任何两个相邻工序即上下工序之间都是供需关系,如何处理这种关系,就是生产物流所要研究的问题。按照传统的生产计划组织生产(包括MRP),物料根据预定的计划时间由供方向需方逐个工序流动。需求方根据上一工序送来物料的数量和到达时间进一步加工。需求方接受物料完全是被动的,如果出现不可预料的因素,物料可能提前或延迟到达。延迟到达将使生产中断,必须在生产计划中留有余地,以避免这种现象的发生。这样一来,必然存在或多或少、提前到达的现象,从而导致系统中库存量的上升,产生种种库存多余的弊病。JIT的方法改变了传统的思路,由需方起主导作用,需方决定供应物料的品种、数量、到达时间和地点。供方只能按需方的指令(一般用看板)供应物料。送到的物料必须保证质量,无残次品。这种思想就是以需定供,可以大大提高工作效率与经济效益。

说明:补充资料仅用于学习参考,请勿用于其它任何用途。
参考词条