1) quadruple completion
四层同时完成
2) concurrent cormpletion
同时完工
5) Makespan
完成时间
1.
Grid system consists of heterogeneous resources, so the major challenge of task scheduling is effectively by using the whole grid power to minimize the task makespan.
网格系统由异构的资源组成,一个好的任务调度方法可以充分利用网格系统的处理能力,减少任务的完成时间。
2.
In grid computing, a good algorithm for tasks scheduling should not only decrease the makespan of all tasks but also balance the load among the resources in the grid system.
分布式计算中,一个好的任务调度算法不但要考虑所有任务的完成时间,使其值尽量小,同样要考虑到整个系统机器间的负载平衡问题。
6) completion time
完成时间
1.
The algorithm adopts a mechanism of the measuring value that considers the completion time and the execution time between tasks and processors as the parameters together,and it adjusts the proportions of both to achieve a better performance.
该算法以任务与处理机的执行时间和完成时间作为参数共同构造任务调度顺序的衡量值,其中二者所占的比重能进行适当调整。
2.
We consider a problem of scheduling n jobs with random processing times on a single machine in order to minimize the expected total weighted absolute deviations of completion times about a common due date.
讨论具有随机加工时间的单机调度问题,目的是确定n个工件的一个排序使得完成时间与一公共交货期差的绝对值加权和的期望最小。
补充资料:层层加码
1.谓逐级增加任务和逐级提出各种要求等。
说明:补充资料仅用于学习参考,请勿用于其它任何用途。
参考词条