1) design load factor
设计负荷系数
2) air-conditioning systemdesign cooling load
系统设计冷负荷
3) plant load factor
设备负荷系数
4) design load
设计负荷
1.
It can be found that under the meteorological condition approximate to that at the peak-load hour of the design day, the design load reached by CTM approximately well with that by traditional calculation method and their load composing are also very similar, which proves the credibility of CTM and it can be used to load.
分别用传统算法和特征温度法对某商场的空调冷负荷进行了计算和对比分析,比较发现在与设计日最大负荷时刻相近的气象条件下,特征温度法得出的设计负荷与传统算法是相近的,负荷构成也是相似的;验证了特征温度法的可靠性,证明它可以作为实际工程负荷计算的依据;用特征温度法研究了全年空调负荷的逐时分布、负荷频率和时间频率随部分负荷率的变化规律,这对商场空调系统设计和设备选型具有一定的指导意义。
5) design load factor
设计荷载系数
6) load factor
负荷系数
1.
According to the performance characteristics of double evaporator air conditioning system, the load factor and fuzzy reasoning method were adopted, one control strategy of this system was presented.
为此 ,从双联变频空调系统的运行特性的研究结果出发 ,引进负荷系数并采用模糊推理方法来确定各房间的负荷 ,制定出该系统中双电子膨胀阀及变频压缩机的控制方法 。
2.
By the method of Computer Aided Geometrical Design(CAGD),with computer graphics technology,the curves of load factor for tray tower are scanned into raster presentation.
利用Visual Basic和AutoCAD混合编程进行计算机准确查图,利用Visual Basic进行人机交互界面设计和前台运算,AutoCAD技术进行后台图形处理,准确确定给定条件下的板式塔负荷系数。
3.
Comments are given on other aspects such as the actual load factor of copper processing equipments and the confirmation of transformer capacity and number, and some calculation methods based on experience are put forward.
对铜加工企业供电电压和供电方式的合理选择、变配电所接近负荷中心的问题进行探讨,并就铜加工设备实际运行负荷系数、变压器容量和台数的确定等方面谈了一些看法,提供了一些经验计算方法。
补充资料:设计负荷
分子式:
CAS号:
性质:又称标准负荷;推荐负荷;设计负荷。指标准规定的不同气压的对应负荷,包括最大负荷。
CAS号:
性质:又称标准负荷;推荐负荷;设计负荷。指标准规定的不同气压的对应负荷,包括最大负荷。
说明:补充资料仅用于学习参考,请勿用于其它任何用途。
参考词条