说明:双击或选中下面任意单词,将显示该词的音标、读音、翻译等;选中中文或多个词,将显示翻译。
您的位置:首页 -> 词典 -> 拦鱼坝
1)  barrier dam
拦鱼坝
2)  barrage [英]['bærɑ:ʒ]  [美][bə'rɑʒ]
拦坝
3)  The sea dam
拦海大坝
4)  debris dam
拦沙堤坝
1.
Through the practice of several works of channel regulation,Dongying Port and the comparison with the traditional technique,the application of hydraulic sliding panel to channel debris dam are mainly introduced.
通过东营港几项航道整治建筑物工程的实践和与传统技术的比较,介绍水力插板在建设航道拦沙堤坝中的应用。
5)  sediment control dam
拦沙坝
1.
This paper studies the stability and protective function of the downstream sediment control dam of the bridge pier for the representative project using hydraulic model tests.
针对典型工程采用水力模型试验的方法对桥墩下游拦沙坝的稳定及防护作用进行了研究,实例表明,在桥墩下游修建拦沙坝作为遏制浅基桥梁附近河段溯源冲刷的工程防护形式是可行的,拦沙坝减缓桥墩附近局部冲刷的作用明显,提出的防护拦沙坝的形式、尺寸等参数为浅基桥梁工程防护设计提供了参考依据。
2.
In order to study local scouring field near the pier with sediment control dam,the 3-D velocity field of the pier in monomer model is subtly measured by ADV velocimeter of Sontek.
采用Sontek公司声学多普勒测速仪(ADV)对有拦沙坝防护的模型桥墩附近流场进行了精细测量,对桥墩冲刷坑内三维流速分布进行了分析,给出了冲刷坑内三维紊动特征量的分布,分析研究了有拦沙防护坝时桥墩局部冲刷的三个新特点,提出了拦沙坝的适用条件。
3.
Comparisons and analyses have been made on the effects of the measures for sediment prevention, including raising normal water level in the reservoir ,building sediment control dam on the upstream of the dam, building submerged sediment control dam and sediment sluice outlet, etc.
通过板桥峪抽水蓄能电站防沙问题的试验研究 ,阐述了解决此类电站泥沙问题所可能采取的措施 ,其中包括抬高水库水位运行 ,在拦河坝以上修建拦沙坝 ,增建拦沙潜坝和排沙洞等。
6)  Lanjiang sand bar
拦江沙坝
1.
In this paper,the erosional and depositional stability of the Lanjiang sand bar in the Longkou Bay is studied by making a comparison between water depth data in different periods,and the erosion and deposition mechanisms of the Lanjiang sand bar are discussed by analyzing the formation process of sand bar and the sediment movement around sand bar.
通过不同时期的水深对比对龙口湾拦江沙坝的稳定性进行研究,从其形成过程和现代泥沙运动的角度对拦江沙坝冲淤变化的机制进行探讨。
补充资料:鱼梁濑坝

鱼梁濑坝

Yanase Dam


概  述

  鱼梁濑坝位于日本高知县安芸郡北川村大字久木,奈半利川水系(Nabarigawa)奈半利川上,其目的为发电。粘土心墙堆石坝,最大坝高115m,水库总库容1.046亿m3。电站最大装机容量3.6万kW。1962年4月开工,1970年完工。
  坝址基岩为粘板岩,局部挟有薄层砂岩。岩质坚硬,层面节理发达。坝轴线上游120m左岸,有一宽约30~50cm的破碎带,并存在有2、3条小断层。坝轴上游110m左岸河床部,有裂隙存在。
  坝址控制流域面积117.1km2,水库面积291hm2,有效库容0.725亿m3。利用水深35m,最高蓄水位440m。设计洪水流量1900m3/s。
  大坝坝顶高程445m。坝顶长202m,坝顶宽10m,最大坝底宽440m。上游坡比1∶2.6,下游坡比1∶2(高程405m以上),1∶2.2(高程405m以下)。心墙上游坡1∶0.3,下游坡1∶0.2。坝体积284万m3
  溢洪道为陡槽式,设2扇闸门。

说明:补充资料仅用于学习参考,请勿用于其它任何用途。
参考词条
拦矸坝  拦挡坝  拦海坝  拦淤坝  拦河坝  筑坝拦水 
  ©2011 dictall.com