说明:双击或选中下面任意单词,将显示该词的音标、读音、翻译等;选中中文或多个词,将显示翻译。
您的位置:首页 -> 词典 -> 拦海坝
1)  sea dam
拦海坝
2)  The sea dam
拦海大坝
3)  barrage [英]['bærɑ:ʒ]  [美][bə'rɑʒ]
拦坝
4)  debris dam
拦沙堤坝
1.
Through the practice of several works of channel regulation,Dongying Port and the comparison with the traditional technique,the application of hydraulic sliding panel to channel debris dam are mainly introduced.
通过东营港几项航道整治建筑物工程的实践和与传统技术的比较,介绍水力插板在建设航道拦沙堤坝中的应用。
5)  sediment control dam
拦沙坝
1.
This paper studies the stability and protective function of the downstream sediment control dam of the bridge pier for the representative project using hydraulic model tests.
针对典型工程采用水力模型试验的方法对桥墩下游拦沙坝的稳定及防护作用进行了研究,实例表明,在桥墩下游修建拦沙坝作为遏制浅基桥梁附近河段溯源冲刷的工程防护形式是可行的,拦沙坝减缓桥墩附近局部冲刷的作用明显,提出的防护拦沙坝的形式、尺寸等参数为浅基桥梁工程防护设计提供了参考依据。
2.
In order to study local scouring field near the pier with sediment control dam,the 3-D velocity field of the pier in monomer model is subtly measured by ADV velocimeter of Sontek.
采用Sontek公司声学多普勒测速仪(ADV)对有拦沙坝防护的模型桥墩附近流场进行了精细测量,对桥墩冲刷坑内三维流速分布进行了分析,给出了冲刷坑内三维紊动特征量的分布,分析研究了有拦沙防护坝时桥墩局部冲刷的三个新特点,提出了拦沙坝的适用条件。
3.
Comparisons and analyses have been made on the effects of the measures for sediment prevention, including raising normal water level in the reservoir ,building sediment control dam on the upstream of the dam, building submerged sediment control dam and sediment sluice outlet, etc.
通过板桥峪抽水蓄能电站防沙问题的试验研究 ,阐述了解决此类电站泥沙问题所可能采取的措施 ,其中包括抬高水库水位运行 ,在拦河坝以上修建拦沙坝 ,增建拦沙潜坝和排沙洞等。
6)  Lanjiang sand bar
拦江沙坝
1.
In this paper,the erosional and depositional stability of the Lanjiang sand bar in the Longkou Bay is studied by making a comparison between water depth data in different periods,and the erosion and deposition mechanisms of the Lanjiang sand bar are discussed by analyzing the formation process of sand bar and the sediment movement around sand bar.
通过不同时期的水深对比对龙口湾拦江沙坝的稳定性进行研究,从其形成过程和现代泥沙运动的角度对拦江沙坝冲淤变化的机制进行探讨。
补充资料:海尔霍尔坝

海尔霍尔坝

Hell Hole Dam


概  述

  海尔霍尔坝位于加利福尼亚州鲁比肯(Rubicon)河上,距萨克拉门托市129km,是普莱瑟县中福克工程系统中的一项关键工程。坝基为辉长岩,坝址控制流域面积295km2,多年平均径流量4亿m3,有记录的洪峰流量188m3/s,总库容3亿m3,有效库容2亿m3,水库面积5km2。斜心墙堆石坝,最大坝高125m,坝顶长472m,坝轴线呈弧线形,曲率半径为1219m。上游坡为1∶2.5,下游坡为1∶1.4,上游坝面作成6m高的多级台阶。心墙上游坡为1∶1.57,下游坡为1∶1.34。无控制溢洪道溢顶为上溢式混凝土堰,最大泄量1960m3/s。利用导流隧洞改建成发电引水管和放水管。厂房布置在左岸岸边,装机容量725kW。工程于1966年完工,电站于1984年建成,后来将引水管道延长至下游17km的新电站,装机容量10.98万kW。

说明:补充资料仅用于学习参考,请勿用于其它任何用途。
参考词条
拦矸坝  拦挡坝  拦淤坝  拦鱼坝  拦河坝  筑坝拦水 
  ©2011 dictall.com