说明:双击或选中下面任意单词,将显示该词的音标、读音、翻译等;选中中文或多个词,将显示翻译。
您的位置:首页 -> 词典 -> 基本延误; 固定延误
1)  fixed delay
基本延误; 固定延误
2)  fixed delay
固定延误
3)  delay cost
延误成本
1.
The type-conversion cost of the resource-type cities can be divided into the adjustment cost and the delay cost.
资源型城市转型成本可以分为调整成本和延误成本。
2.
In this paper,the problem of the slot assignment of CDM GDP was studied,and an optimization model based on equitable delay cost assignment was established.
研究了CDM GDP机场时隙资源的公平分配问题,提出了基于延误成本公平分配的新的协同地面等待优化模型。
4)  delay [英][dɪ'leɪ]  [美][dɪ'le]
延误
1.
Clinical analysis on factors of delay or misdiagnosis of carcinoma on eyelids;
眼睑恶性肿瘤延误诊治因素的临床分析
2.
Study on intersection signal timing and optimization based on delays;
基于延误分析的交叉口信号配时优化研究
3.
Approach delay model of signalized intersection;
信号交叉口进口道延误模型
5)  tardiness [英]['tɑ:dinis]  [美]['tɑrdɪnɪs]
延误
1.
In 1956 Smith made a deep research on"perfect"scheduling,which is to find the minimal average completion time without tardiness jobs.
然而,在实际问题中往往是允许工件误工的,也就是说,工件可以在交货期之后完工,即允许工件有延迟或者延误,只是针对不同的问题对工件的延迟或者延误有不同的要求。
2.
The tardiness penalty of an activity was determined by its delay time and importance(the slack time and the cost of overtaking of successor activities).
对计划评审技术中各项活动的延误对总工期和总费用的影响进行研究,提出在计划评审技术中对延误活动的惩罚不应该只由该活动延误时间的长短来决定,而应综合考虑各项活动在计划评审技术中的重要性、后继活动赶工限度和赶工成本等因素。
3.
In 2007,a paper proved that the two multi-criteria scheduling problems 1‖(ΣC_j/ΣU_j) or 1‖(ΣT_j/ΣU_j) to minimize the total completion time or the total tardiness with minimum number of tardy jobs are NP hard.
2007年有文献证明以误工工件个数最少为第1目标、使总完工时间最小或者使总延误最小的多重目标排序问题1‖(∑C_j/∑U_j)或者1‖(∑T_j/∑U_j)都是NP困难的。
6)  tardy [英]['tɑ:di]  [美]['tɑrdɪ]
延误
1.
Determination of the CDW to Minimize the Weighted Number of Early and Tardy Jobs;
最小化提前/延误赋权工件数及时窗惩罚的排序问题(英文)
2.
The strongly NP-hard and polynomial time approximation scheme(PTAS) was proposed to minimize the weighted number of early and tardy jobs together with the window location penalty.
考虑多个工件在平行机上加工的生产调度问题,这些工件相互独立且有相同的交货期窗口,但交货期窗口的位置待定,其目标是最小化提前和延误的赋权工件数及交货期窗口定位费用的和。
3.
They are JIT (Just-In- Time) sequencing and scheduling problems, which assume the existence of job due dates and discourage early as well as tardy jobs.
为了避免储存以及隐藏的额外运转带来的高费用,比如由于等待、传递、额外劳动力、重加工以及订单改变等引起的效益损失,生产商不仅考虑延误带来的惩罚还必须顾及提前完工付出的费用;此乃准时排序问题。
补充资料:对战时拒绝、故意延误军事订货罪
对战时拒绝、故意延误军事订货罪:指战时有关生产、销售单位无正当理由拒绝、故意延误军事订货,情节严重的行为。
说明:补充资料仅用于学习参考,请勿用于其它任何用途。
参考词条