1.
Three-dimensional element analysis of intake chamber of Qincaosha water source site;
青草沙水源地工程输水闸进水井结构有限元分析
2.
The whole construction process of the intake chamber of Qincaosha water source site is modeled by 3D finite element codes Plaxis-3D Foundation;the influence on the intake chamber of the dike and management services is also analyzed;the measures to control settlement of the intake chamber are presented;the strain and stress of the intake chamber are given under 2 controlling conditions.
运用三维有限元Plaxis-3D Foundation模块对青草沙水源地输水闸进水井的整个施工过程进行了有限元模拟,分析了大堤和管理区加载对进水井沉降的影响,提出了控制进水井沉降的地基处理措施,得出2种控制工况下结构的变形和应力分布,为结构设计和施工提供了参考依据。
5) tapping of groundwater
潜水集水井
6) water-collecting well
集水井
1.
The reform of the traditional water-collecting well control system of Jinxi Hydropower Plant with the technology of PLC and XST water-level-control apparatus is introduced.
介绍了利用可编程逻辑控制器(PLC)技术和XST液位控制仪对金溪水电站传统的集水井控制回路进行改造的过程。