说明:双击或选中下面任意单词,将显示该词的音标、读音、翻译等;选中中文或多个词,将显示翻译。
您的位置:首页 -> 句库 -> 集水井
1.
Scheme Analysis of Reconstructing Underground Water Channel Working Shaft into Water Collecting Well
引水隧道施工井改造为集水井方案分析
2.
Improvement measure of pump water control device of collecting well in hydropower station
水电站集水井抽水控制装置的改进措施
3.
Theoretical and Experimental Studies of Collection and Transport in High Water Cut Oil Well at Normal Temperature;
高含水油井常温集输实验和理论研究
4.
Application of Mine Well Draining and Controling System in Zhangji Coal Mine
矿井排水控制系统在张集煤矿的应用
5.
Adopt "water-jet" method to embedded well point pipe. Connect to the water-collect main line while the well point pipe is in the position.
采用"射水法"埋设井点管.井点管下沉到位后,与集水总管连接.
6.
The guiding function of mud logging for increasing effective drilling catching rate in reservoirs of horizontal wells
录井对提高水平井储集层有效钻遇率的导向作用
7.
Study on the Well Logging Interpretation Method of Oil-Gas-Water Three Phase Flow with Telemetry Petal Type Tool;
遥测伞集流油气水三相流测井解释方法研究
8.
The Regularitis of the Mineralization Enrichment and Ore Prediction of the Xiaoshuijing Gold Deposit in Middle Yunnan;
滇中小水井金矿床矿化富集规律及找矿预测
9.
Study on Transmissibility and Rock Mass Groutability of the Fault Group Crossing the Tunnels of Banji Mine
板集矿井石门巷道断层群导水性及可灌性研究
10.
Data Acquisition and Control System for Oil-Gas-Water of Three-phase Flow Simulation Well
油气水三相流模拟井数据采集控制系统
11.
PRACTICE OF PROCESS IMPROVEMENT OF MINE DRAINAGEIN ZHANGJI COAL MINE
张集煤矿矿井水处理工艺改进技术实践
12.
The Ore-controlling Structures and the Regularitis of the Mineralization Enrichment of the Xiaoshuijing Gold Deposit in Middle Yunnan
滇中小水井金矿床控矿构造与矿化富集规律
13.
Most wells were "flowing" wells or those that penetrated shallow ground water levels.
大多数水井是“冒水”井,或者是浅水位井。
14.
Hydro-geological Characteristics and Mine Water-filled Factors of Hanzhuang Coal Mine in Henan
河南天瑞集团韩庄矿水文地质特征与矿井充水因素分析
15.
In indined or horizontal shafts, conveyer belts are frequently used for this purpose. at the bottom of the shaft is a sump, a pit which collects water.
在斜井和平峒中,常用带式运输机来完成这个工作。井底有一个水仓,用来集水。
16.
660m depthdrilling shaft lining structure design and analysis of main shaft Ban Ji mine
板集主井660m深钻井井壁结构设计分析
17.
Comprehensive Analysis on the Technical Economy of Precipitation of Light Well Point and Deep Well Point;
轻型井井点降水与深井井点降水之综合分析
18.
Alternative Integrated Design of the Pump House and Absorption Well System at LiuHai Coal Mine;
柳海矿泵房吸水井立体交叉硐室群集约化新设计研究