1) puddle cofferdam
夯土围堰
2) Earth-rock cofferdam
土石围堰
1.
The blasting method for notch of the earth-rock cofferdam antiseepage wall at the second stage of chinese Three Gorges Project, the measurement results of water hammer wave are presented, the influential factors of affecting the intensity of water hammer wave are analyzed, the control opf explosive dose of notch and protection method are put forward.
概述三峡二期土石围堰防渗墙槽孔爆破方法 ,列出其水击波测试成果 ,分析影响水击波强度的因素 ,提出槽孔爆破药量控制和防护方法的建议。
2.
Dabu power-plant had been successful in applying anti-leakage new technology of high pressure spraying guniting for earth-rock cofferdam on the blanket of gravels, which shortened construction period with good anti-leakage effect and obvious economic benefit.
大埔水电站应用高压喷射灌浆防渗技术在砂砾石覆盖层上进行土石围堰获得成功。
3) earth-rockfill cofferdam
土石围堰
1.
Anti-seepage technique for construction of upstream earth-rockfill cofferdams of Goupitan Hydropower Plant;
构皮滩水电站上游土石围堰防渗处理技术
2.
Application of controlled grouting to anti-seepage of earth-rockfill cofferdam;
控制灌浆技术在土石围堰防渗处理中的应用
3.
Anti-seepage construction of earth-rockfill cofferdam for Yinpan Hydropower Station
银盘水电站土石围堰防渗施工及评价
4) embankment cofferdam
土石围堰
1.
Application of controlled curtain grouting impervious technology in embankment cofferdams;
控制性帷幕灌浆防渗技术在土石围堰中的应用
2.
The impervious technique of high-pressure gunite applied to stage Ⅰembankment cofferdam of the Three Gorges Project was introduced comprehensively.
对高压喷射灌浆防渗技术在三峡工程一期土石围堰中的成功应用作了全面的介绍,详细阐述了其施工布置、施工主要参数、施工程序和施工方法。
5) earth cofferdam
土围堰
1.
Taking one work as example and according to its features the foundation treatment techniques are introduced from earth cofferdam, heavy curtain piles, dewatering, drainage and other aspects, which provides good references for similar works.
结合某工程实例 ,从工程特点、土围堰、支护帷幕桩、降水、排水等方面对该工程地基处理技术进行了详细的介绍 ,对类似工程的施工具有很好的参考价值。
2.
This paper introduces the joint application of high-pressure jet grouted piles and cement soil mixed piled for dealing with seepage of earth cofferdam for dry dock in Rizhao Port.
介绍高压喷射注浆和水泥土搅拌桩防渗加固技术在日照港干船坞土围堰防渗处理中的组合应用。
6) earth-bag cofferdam
土袋围堰
1.
The procedure of construction with earth-bag cofferdam is introduced for the open-cut foundation in deep water and sandy soil with a narrow space at Pier No.
介绍赣龙铁路18标段在苏家坡大桥5#墩场地狭窄条件下,深水砂性土中明挖基础,采用土袋围堰施工过程,对今后同类型的水中基础施工可起借鉴作用。
补充资料:夯土机
利用冲击和冲击振动作用分层夯实回填土的压实机械。分火力夯、蛙式夯和快速冲击夯等。
火力夯 按二冲程内燃机原理制成,汽缸内有上、下两个活塞,上活塞是内燃活塞,下活塞是缓冲活塞。汽缸下部套装有倾斜底面的夯锤,使汽缸竖向轴线朝前偏斜。上活塞杆从汽缸顶盖中间的通孔伸出,下活塞杆从汽缸下端面伸出,并与夯锤联成一体,汽缸与夯锤之间以弹簧拉紧,并设有扶手以控制夯土机的前进方向。火力夯在可燃混合气的燃爆力作用下,朝前上方跃离地面,并在自重作用下,坠落地面夯击土壤,夯锤一跃一坠,机身就步步前移。
电动蛙式夯 利用旋转惯性力的原理制成,由夯锤、夯架、偏心块、皮带轮和电动机等组成。电动机及传动部分装在橇座上,夯架后端与传动轴铰接,在偏心块离心力作用下,夯架可绕此轴上下摆动。夯架前端装有夯锤,当夯架向下方摆动时就夯击土壤,向上方摆动时使橇座前移。因此,蛙式夯夯锤每冲击一次,机身即向前移动一步。
快速冲击夯 由电动机经减速器和曲柄连杆机构带动夯锤做快速冲击运动以夯实土壤,夯锤跳离地面时,操作者可推动机械前进,为减轻机体振动,设缓冲弹簧组。
夯土机夯实粘性土壤的效果较佳,但其夯锤面积有限,不宜用于大面积土方的夯实作业。对于砂土、砾石则需另选用振动捣固机予以捣实。
火力夯 按二冲程内燃机原理制成,汽缸内有上、下两个活塞,上活塞是内燃活塞,下活塞是缓冲活塞。汽缸下部套装有倾斜底面的夯锤,使汽缸竖向轴线朝前偏斜。上活塞杆从汽缸顶盖中间的通孔伸出,下活塞杆从汽缸下端面伸出,并与夯锤联成一体,汽缸与夯锤之间以弹簧拉紧,并设有扶手以控制夯土机的前进方向。火力夯在可燃混合气的燃爆力作用下,朝前上方跃离地面,并在自重作用下,坠落地面夯击土壤,夯锤一跃一坠,机身就步步前移。
电动蛙式夯 利用旋转惯性力的原理制成,由夯锤、夯架、偏心块、皮带轮和电动机等组成。电动机及传动部分装在橇座上,夯架后端与传动轴铰接,在偏心块离心力作用下,夯架可绕此轴上下摆动。夯架前端装有夯锤,当夯架向下方摆动时就夯击土壤,向上方摆动时使橇座前移。因此,蛙式夯夯锤每冲击一次,机身即向前移动一步。
快速冲击夯 由电动机经减速器和曲柄连杆机构带动夯锤做快速冲击运动以夯实土壤,夯锤跳离地面时,操作者可推动机械前进,为减轻机体振动,设缓冲弹簧组。
夯土机夯实粘性土壤的效果较佳,但其夯锤面积有限,不宜用于大面积土方的夯实作业。对于砂土、砾石则需另选用振动捣固机予以捣实。