1) cased-in pile
带套桩
2) skirt pile sleeve
群桩套简
3) steel lagged pile
钢套桩
1.
The "steel lagged pile vibrating-hamming" technique was adopted to realize redriving of reinforced concrete friction pile with medium to long intermittence in soft soil,and thus the quality of pile foundation was guaranteed.
采用"钢套桩震动—锤击"技术,解决在软土中长期间歇的钢筋混凝土摩擦桩克服桩周土阻力,进行复打,保证了桩基质量。
4) sleeve pipe pile
套管桩
5) lagged pile
加套桩
6) dressing table set
梳桩台套
补充资料:板带轧制压下规程(见板带轧制规程设计)
板带轧制压下规程(见板带轧制规程设计)
draughting schedule for plate and strip rolling
bandai zhazhi yaxia guieheng板带轧制压T规程(draughting,ehedule forplate and strip rolling)见板带札制规程设计。
说明:补充资料仅用于学习参考,请勿用于其它任何用途。
参考词条