说明:双击或选中下面任意单词,将显示该词的音标、读音、翻译等;选中中文或多个词,将显示翻译。
您的位置:首页 -> 词典 -> 保证压力验收试验
1)  proof pressure test for acceptance
保证压力验收试验
2)  proof pressure test
保证压力试验
3)  warranty test
验收试验,保证试验,认可试验
4)  proof test
保证数据验收试验
5)  proof test
保证试验
1.
And also a simple technique of proof test was created, that is useful for non-destructive evaluation of the strength for brittle components.
利用均强度准则提出了一种脆性材料局部强度和表面残余应力的压痕测试方法,并建立了一种简便的强度保证试验技术,对脆性构件的非破坏性能评价有实用意义。
2.
The effect of proof test on the fatigue strength and lifetime of soda lime glass specimens is studied.
研究了保证试验对钙钠玻璃的循环疲劳强度及寿命的影响。
3.
The effect of proof testing on the fatigue strength of ceramic specimens is analyzed by means of the fracture mechanics approach.
应用断裂力学理论分析了保证试验对陶瓷试件造成的损伤及其对疲劳强度的影响。
6)  assurance test
保证试验
1.
As the test time needed is very short,the assurance test is highly appreciated.
保证试验是近年来引起可靠性工程界广泛重视的一种可靠性验收试验方法。
2.
On the basis of strict mathematical description about the assurance test,the optimal lower confidence limit and upper confidence limit are found out by the method of arranging order in the sample space.
在对MTBF(平均无故障时间间隔)保证试验进行严格的数学描述的基础上,利用样本空间排序法找出了MTBF在一定意义下最优的置信下限和置信上限。
3.
Because the test time needed is very Short,the Assurance test in MIL-HDBK-781 is highty appreciated.
美国军用标准 MIL— H DBK— 781中的保证试验以其所需的试验时间短而引起可靠性工程界的广泛关注。
补充资料:承包人要求发包人组织工程验收,包括隐蔽工程的验收和工程竣工的验收的权利
承包人要求发包人组织工程验收,包括隐蔽工程的验收和工程竣工的验收的权利:根据我国《合同法》的第278条规定隐蔽工程在隐蔽以前,承包人应当通知发包人检查。发包人没有及时检查的,承包人可以顺延工程日期,并有权要求赔偿停工、窝工等损失。根据《合同法》第279条中的规定建设工程竣工后,发包人应当根据施工图纸及说明书、国家颁发的施工验收规范和质量检验标准及时进行验收,因此在工程完成时组织竣工验收,也是发包人的主要义务。建设工程竣工验收合格后,方可交付使用,未经验收或者验收不合格的,不得交付使用,发包人对未经验收的工程,提前使用或者擅自动用的,对发现的质量问题由发包人自行承担责任。-------------《民法》第一版,第514页。魏振瀛;《合同法》的第278条
说明:补充资料仅用于学习参考,请勿用于其它任何用途。
参考词条