1) dualistic phrase
二元用语
2) two-tuple linguistic
二元语义
1.
Research on vendor evaluation and selection based on AHP and two-tuple linguistic.;
基于层次分析法和二元语义的供应商评价研究
2.
On priority of trapezoidal fuzzy number complementary judgment matrix based on two-tuple linguistic;
梯形模糊数判断矩阵的二元语义排序方法
3.
Group decision making method based on two-tuple linguistic for judgment matrices with different fuzzy preferences;
不同偏好形式判断矩阵的二元语义群决策方法
3) two-tuple linguistic representation
二元语义
1.
A Group Comprehensive Evaluation Method of Project Success Degree Based on Two-tuple Linguistic Representation
基于二元语义的项目成功度群体综合评价方法
2.
In the method, the linguistic assessment information provided by decision makers is transformed into two-tuple linguistic representations which were developed in recent years.
针对具有语言信息的多指标群体综合评价问题,提出了一种新的求解方法·在该方法中,首先将各决策者给出的语言评价信息转化为二元语义形式,然后通过求解所建立的优化模型得到群体综合评价值,再根据二元语义自身特点进行方案排序,并得到群体综合评价结果·利用二元语义描述和处理语言评价信息,能够有效避免信息的损失和集结结果的不精确性,因此,该方法具有计算简单和语言信息集结结果准确等特点·最后给出了一个算例
3.
In the approach, the two-tuple linguistic representation developed in recent years is used to aggregate the linguistic assessment information.
该方法是采用近年来最新发展的二元语义概念对语言评价信息进行处理和运算。
4) 2-tuple linguistic
二元语义
1.
Method for 2-tuple linguistic group decision making based on the ET-WG and ET-OWG operators
基于ET-WG和ET-OWG算子的二元语义群决策法
2.
Consider the character of grey cluster decision-making and 2-tuple linguistic assessment, proposed the method of 2-tuple linguistic assessment based on grey cluster.
结合灰色聚类分析方法和二元语义评价方法的特点,定性与定量相结合,提出了基于灰色聚类分析的二元语义评价方法,最后通过商业银行监管进行了实证研究,验证了该方法的有效性。
5) two-tuple
二元语义
1.
Method of grey relational analysis for multiple attribute group decision making in two-tuple linguistic setting;
基于二元语义多属性群决策的灰色关联分析法
2.
Method for group decision making based on two-tuple linguistic information processing;
基于二元语义信息处理的一种语言群决策方法
3.
A group decision-making method for linguistic assessment based on two-tuple linguistic projection operator
基于二元语义投影算子的语言群决策方法
6) bi-gram
二元语法
1.
Model of Chinese words rough segmentation based on bi-gram and N-most-probability method;
基于二元语法的N-最大概率中文粗分模型
2.
Based on the completement of one-level tagging of the dictionary,it adopts statistical methods,gaining model training parameter under the bi-gram HMM,and adopting the .
分析了哈萨克语的构形语素特征,基于词典的一级标注基础上,采用统计方法,训练得到二元语法的HMM模型参数,运用Viterbi算法完成了基于统计方法的词性标注,最后运用哈语规则库对词性标注进行了修正。
3.
Then,it used the method based on bi-gram statistical model to label the candidate sets.
首先基于词典和一元语法统计模型生成N个最优结果作为候选集;然后对候选集进行基于二元语法统计模型的词性标注,最后利用对文本的上下文"理解"信息来确定最佳切分结果。
补充资料:工厂外贸业务常用语大全(二)
生产类
PCs Pieces 个(根,块等)
PRS Pairs 双(对等)
CTN Carton 卡通箱
PAL Pallet/skid 栈板
PO Purchasing Order 采购订单
MO Manufacture Order 生产单
D/C Date Code 生产日期码
ID/C Identification Code (供货商)识别码
SWR Special Work Request 特殊工作需求
L/N Lot Number 批号
P/N Part Number 料号
OEM Original Equipment Manufacture 原设备制造
PC Personal Computer 个人计算机
CPU Central Processing Unit 中央处理器
A.S.A.P As Soon As Possible 尽可能快的
E-MAIL Electrical-Mail 电子邮件
N/A Not Applicable 不适用
QTY Quantity 数量
I/O input/output 输入/输出
NG Not Good 不行,不合格
C=0 Critical=0 极严重不允许
APP Approve 核准,认可,承认
CHK Check 确认
ASS’Y Assembly 装配,组装
T/P True Position 真位度
5WIH When, Where, Who, What, Why, How to
6M Man, Machine, Material, Method, Measurement, Message
4MTH Man, Material, Money, Method, Time, How 人力,物力,财务,技术,时间(资源)
SQA Strategy Quality Assurance 策略质量保证
DQA Design Quality Assurance 设计质量保证
MQA Manufacture Quality Assurance 制造质量保证
SSQA Sales and service Quality Assurance 销售及服务质量保证
LRR Lot Reject Rate 批退率
SPS Switching power supply 电源箱
DT Desk Top 卧式(机箱)
MT Mini-Tower 立式(机箱)
DVD Digital Video Disk
VCD Video Compact Disk
LCD Liquid Crystal Display
CAD Computer Aided Design
CAM Computer Aided Manufacturing
CAE Computer Aided Engineering
PCB Printed Circuit Board 印刷电路板
CAR Correction Action Report 改善报告
NG Not Good 不良
WDR Weekly Delivery Requirement 周出货要求
PPM Percent Per Million 百万分之一
TPM Total Production Maintenance 全面生产保养
MRP Material Requirement Planning 物料需计划
OS Operation System 操作系统
PCs Pieces 个(根,块等)
PRS Pairs 双(对等)
CTN Carton 卡通箱
PAL Pallet/skid 栈板
PO Purchasing Order 采购订单
MO Manufacture Order 生产单
D/C Date Code 生产日期码
ID/C Identification Code (供货商)识别码
SWR Special Work Request 特殊工作需求
L/N Lot Number 批号
P/N Part Number 料号
OEM Original Equipment Manufacture 原设备制造
PC Personal Computer 个人计算机
CPU Central Processing Unit 中央处理器
A.S.A.P As Soon As Possible 尽可能快的
E-MAIL Electrical-Mail 电子邮件
N/A Not Applicable 不适用
QTY Quantity 数量
I/O input/output 输入/输出
NG Not Good 不行,不合格
C=0 Critical=0 极严重不允许
APP Approve 核准,认可,承认
CHK Check 确认
ASS’Y Assembly 装配,组装
T/P True Position 真位度
5WIH When, Where, Who, What, Why, How to
6M Man, Machine, Material, Method, Measurement, Message
4MTH Man, Material, Money, Method, Time, How 人力,物力,财务,技术,时间(资源)
SQA Strategy Quality Assurance 策略质量保证
DQA Design Quality Assurance 设计质量保证
MQA Manufacture Quality Assurance 制造质量保证
SSQA Sales and service Quality Assurance 销售及服务质量保证
LRR Lot Reject Rate 批退率
SPS Switching power supply 电源箱
DT Desk Top 卧式(机箱)
MT Mini-Tower 立式(机箱)
DVD Digital Video Disk
VCD Video Compact Disk
LCD Liquid Crystal Display
CAD Computer Aided Design
CAM Computer Aided Manufacturing
CAE Computer Aided Engineering
PCB Printed Circuit Board 印刷电路板
CAR Correction Action Report 改善报告
NG Not Good 不良
WDR Weekly Delivery Requirement 周出货要求
PPM Percent Per Million 百万分之一
TPM Total Production Maintenance 全面生产保养
MRP Material Requirement Planning 物料需计划
OS Operation System 操作系统
说明:补充资料仅用于学习参考,请勿用于其它任何用途。
参考词条