说明:双击或选中下面任意单词,将显示该词的音标、读音、翻译等;选中中文或多个词,将显示翻译。
您的位置:首页 -> 词典 -> RCC高坝
1)  High RCC dam
RCC高坝
2)  Gaobazhou RCCD
高坝洲RCC坝体
3)  RCC gravity dam
RCC重力坝
1.
Study on reasonable seepage control scheme of 200m height RCC gravity dam;
200m级RCC重力坝优选渗控设计方案研究
2.
Research on the heat preservation and crack-prevention measures for RCC gravity dam in severly cold and dry area
严寒干旱地区RCC重力坝的保温防裂措施
3.
The safety monitoring system is designed based on the characteristics of Baise RCC gravity dam, with emphasis put on the weak structural position and concerned part.
根据百色RCC重力坝的特点进行安全监测设计 ,对结构薄弱环节和受关注部位重点监测 ,做到少而精 ,突出重点 ,兼顾全面 ,为施工期、运行期安全需要服
4)  RCC arch dam
RCC拱坝
1.
Thermal load is one of the main loads of arch dam,at present,the method of adopting thermal load of normal concrete in RCC arch dam calculation underestimates the action of temperature.
温度荷载是拱坝最主要的荷载之一,目前,通常采用计算常态混凝土温度荷载的方法计算RCC拱坝,这低估了温降的作用。
5)  RCC damming
RCC筑坝
6)  RCC main dam
RCC大坝
1.
Application of polymer cement waterproof paint in RCC main dam of Baise Multipurpose Dam Project;
聚合物水泥防水涂料在百色水利枢纽RCC大坝上的应用
补充资料:阿斯旺高坝
阿斯旺高坝
Aswan High Dam

   埃及尼罗河上具有灌溉、发电、防洪等综合效益的大型水利工程。位于开罗以南约700千米,水库总库容1689亿立方米。坝基岩层为花岗片麻岩,覆盖层很厚,最深处有225米。坝系粘土心墙堆石坝,最大坝高111米,顶宽40米,底宽980米,坝顶长3830米,坝轴弯向上游,半径1400米。坝基防渗采用与心墙连接的上游水平铺盖和心墙下的帷幕灌浆,帷幕最深处有170米,厚度自上而下由40米减至20米。电站厂房位于右岸边,利用施工期6条直径15米的导流隧洞改建成发电与泄洪合一的引水隧洞,装机12台,共210万千瓦。最大泄洪量6000立方米/秒。工程于1961年开工,1970年竣工。
说明:补充资料仅用于学习参考,请勿用于其它任何用途。
参考词条