1) high dam foundation
高坝坝基
1.
Analysis of dynamic effect characteristic for high dam foundation under earthquake load;
地震荷载作用下高坝坝基的动力响应特征分析
2) high dam basement
高坝地基
1.
of China: optimal selection of dam type; high dam large discharge spillway and energy dissipation technology; steel reinforced diversion bifurcation technology; high dam basement processing technology; prestressed bolting of high side rock slope etc.
全面总结了建国以来我国水电建设的坝工技术成就,涉及坝型优选、高坝大流量泄水建筑物及消能工技术、钢筋混凝土引水岔管技术、高坝地基处理技术、岩质高边坡预应力锚固处理等。
3) high dam rock foundation
高坝岩基
1.
For high dam rock foundation intersected by inversely dipping discontinuities such as shear zones,faults,joints,etc,it is generally considered that its deep sliding mode is wedge sliding along the weak planes.
对于含反倾结构面的高坝岩基,一般认为其深层滑动模式为沿反倾结构面的楔形体滑动。
4) high slope of dam foundation
坝基高边坡
5) arch dam foundation
拱坝坝基
1.
Study on failure model and stability of Yuanmamguan arch dam foundation;
园满贯拱坝坝基(肩)破坏模式及稳定性研究
6) dam and dam foundation
坝基坝体
补充资料:阿斯旺高坝
阿斯旺高坝 Aswan High Dam 埃及尼罗河上具有灌溉、发电、防洪等综合效益的大型水利工程。位于开罗以南约700千米,水库总库容1689亿立方米。坝基岩层为花岗片麻岩,覆盖层很厚,最深处有225米。坝系粘土心墙堆石坝,最大坝高111米,顶宽40米,底宽980米,坝顶长3830米,坝轴弯向上游,半径1400米。坝基防渗采用与心墙连接的上游水平铺盖和心墙下的帷幕灌浆,帷幕最深处有170米,厚度自上而下由40米减至20米。电站厂房位于右岸边,利用施工期6条直径15米的导流隧洞改建成发电与泄洪合一的引水隧洞,装机12台,共210万千瓦。最大泄洪量6000立方米/秒。工程于1961年开工,1970年竣工。 |
说明:补充资料仅用于学习参考,请勿用于其它任何用途。
参考词条