说明:双击或选中下面任意单词,将显示该词的音标、读音、翻译等;选中中文或多个词,将显示翻译。
您的位置:首页 -> 词典 -> 地下厂房施工
1)  construction of underground powerhouse
地下厂房施工
2)  underground workshop
地下厂房
1.
Study on optimization of blasting parameters of anchoring rock beam in the underground workshop of baise hydroelectric station;
百色水电站地下厂房岩锚梁爆破参数优化研究
2.
Analysis of the leakage in the underground workshopof Xianghongdian Pumped Storage Station;
响洪甸抽水蓄能电站地下厂房渗水分析
3)  underground plant
地下厂房
1.
The monitoring project of Zhouning Hydropower station underground plant and water intake system including monitoring of the surrounding rock deformation,bolt stress,osmotic pressure and joint.
周宁水电站地下厂房及引水系统的监测项目包括围岩变形监测、锚杆应力计监测、渗透压力监测、测缝计监测。
2.
Supporting for the top vault of underground plant in Xiaolangdi project is carried out in two stages.
小浪底工程地下厂房顶拱分两期支护,一期为钢筋网喷混凝土加岩石张拉锚杆,二期为顶拱系统预应力锚索。
3.
Applying the ROCKY analysis programme, a FEM nonlinear numerical simulation is performed for the Original stress field of the adjoining rock of the underground plant area of the Qingjiang Shuibuya key hydropower and the stress field of post - excavation of underground space.
应用ROCKY分析程序对清江水布垭水电枢纽地下厂房区围岩原始应力场及开挖地下空间后的应力场进行了有限元非线性数值模拟,所得结论已成为水布垭设计的依据。
4)  underground powerhouse
地下厂房
1.
Temperature stress control measures for rock anchor beam in the underground powerhouse of the Three Gorges Project;
三峡电站地下厂房岩锚梁温度应力控制措施探讨
2.
Analysis on monitoring of underground powerhouse and water conduit system during water filling and storing process at Langyashan Pumped Storage Hydropower Station;
琅琊山抽水蓄能电站地下厂房及水道系统充、蓄水过程中监测分析
3.
Estimation of infiltration water volume for underground powerhouse in Huanggou pumped storage power station;
荒沟抽水蓄能电站地下厂房渗水量估算
5)  underground power house
地下厂房
1.
Experiment on initial stress of underground power house and bifurcated pipe section in Shuanggou station;
双沟蓄能电站地下厂房及岔管段地应力试验研究
2.
The cavern excavating technique of the Xiaoguanzi hydropower station s underground power house;
小关子电站地下厂房洞室开挖技术
3.
The fire fighting facilities for the main mechanical and electrical equipment of underground power house in Ertan Hydropower Station;
二滩水电站地下厂房主要机电设备的消防设施
6)  underground power station
地下厂房
1.
Approximate calculation of seepage discharge from drainage system of underground power station;
地下厂房洞室群排水系统渗流量的粗略估算方法
2.
Acceleration amplification region and dynamic tensile region of Tianlonghu underground power station are studied using 3-D finite element seismic analysis.
上述结果为最终确定地下厂房方案 ,优化布置方案提供了设计参考依
3.
And the seepage field of underground power station of Baise hydroproject is calculated in detail and some evaluations and suggestions are put forword on the design mesure of seepage control of the part of the power station.
采用固定网格求解有自由面渗流问题的结点虚流量法和排水孔改进排水子结构技术 ,精细模拟了排水孔、幕中众多排水孔的孔径、孔距、孔深及排水降压渗流行为 ,自动判别排水孔是否穿越渗流自由面 ,对百色水利枢纽地下厂房区 (地面升压站方案 )的渗流场进行了详细的计算分析 ,并对厂区渗控设计方案提出了评价和建议。
补充资料:地下厂房开挖
      为建造位于地下的厂房,将土和岩石松动、破碎、挖掘和运输出渣的工程。地下厂房一般断面较大,在开挖过程中,保持顶拱安全和高边墙稳定的问题十分重要,施工中要根据具体条件采用相应的施工方法。主要的方法是:①钻孔爆破法。一般先开挖顶拱和进行顶拱支护、衬砌,然后再进行下部分层分台阶的开挖。开挖后立即进行锚喷。如日本今市抽水畜能电站的地下厂房,宽33.5m、高51m、长160m,首先在顶部开挖宽8m、高7.5m的中心导洞,全长挖完后,再扩挖加宽到22m,然后用阶梯式,逐渐加深加宽洞室的主体部位(见图)。②光面爆破和预裂爆破技术。③锚喷支护。对高边墙则采用预应力锚索、锚杆和喷射混凝土相结合的结构,并可作为永久支护。④将新奥法(见隧洞开挖)的原则应用于大断面地下厂房的开挖。如德国瓦尔德克二级抽水蓄能电站的地下厂房,宽33.5m、高54m、长106m,地质条件较差,按新奥法的原则施工,取得良好结果。⑤采用汽车和带式输送机运输。地下厂房与各项联通的洞室群错综复杂,需综合考虑厂房本身及其他洞室的交通运输方式,合理选择出渣方式。一般采用汽车或带式输送机,以汽车运输方式居多。还可利用竖井,从底部的作业洞出渣。⑥预留支撑岩柱。在地质条件差,开挖跨度大的情况下,可采用在中间预留岩柱,最后挖除的办法。如中国龙羊峡水电站厂房安装间在地下,最大开挖跨度38.2m、高38m、洞长47m。由于围岩受断层切割,地质条件复杂,施工中利用预留岩柱支撑,分段开挖,分段衬砌,终于安全建成。
  

说明:补充资料仅用于学习参考,请勿用于其它任何用途。
参考词条