1) main underground powerhouse
地下主厂房
1.
For this reason,this paper describes the structure features of main underground powerhouse,concrete construction program and construction method.
为此,就地下主厂房系统结构特点、混凝土施工程序、施工方法进行介绍。
2) underground workshop
地下厂房
1.
Study on optimization of blasting parameters of anchoring rock beam in the underground workshop of baise hydroelectric station;
百色水电站地下厂房岩锚梁爆破参数优化研究
2.
Analysis of the leakage in the underground workshopof Xianghongdian Pumped Storage Station;
响洪甸抽水蓄能电站地下厂房渗水分析
3) underground plant
地下厂房
1.
The monitoring project of Zhouning Hydropower station underground plant and water intake system including monitoring of the surrounding rock deformation,bolt stress,osmotic pressure and joint.
周宁水电站地下厂房及引水系统的监测项目包括围岩变形监测、锚杆应力计监测、渗透压力监测、测缝计监测。
2.
Supporting for the top vault of underground plant in Xiaolangdi project is carried out in two stages.
小浪底工程地下厂房顶拱分两期支护,一期为钢筋网喷混凝土加岩石张拉锚杆,二期为顶拱系统预应力锚索。
3.
Applying the ROCKY analysis programme, a FEM nonlinear numerical simulation is performed for the Original stress field of the adjoining rock of the underground plant area of the Qingjiang Shuibuya key hydropower and the stress field of post - excavation of underground space.
应用ROCKY分析程序对清江水布垭水电枢纽地下厂房区围岩原始应力场及开挖地下空间后的应力场进行了有限元非线性数值模拟,所得结论已成为水布垭设计的依据。
4) underground powerhouse
地下厂房
1.
Temperature stress control measures for rock anchor beam in the underground powerhouse of the Three Gorges Project;
三峡电站地下厂房岩锚梁温度应力控制措施探讨
2.
Analysis on monitoring of underground powerhouse and water conduit system during water filling and storing process at Langyashan Pumped Storage Hydropower Station;
琅琊山抽水蓄能电站地下厂房及水道系统充、蓄水过程中监测分析
3.
Estimation of infiltration water volume for underground powerhouse in Huanggou pumped storage power station;
荒沟抽水蓄能电站地下厂房渗水量估算
5) underground power house
地下厂房
1.
Experiment on initial stress of underground power house and bifurcated pipe section in Shuanggou station;
双沟蓄能电站地下厂房及岔管段地应力试验研究
2.
The cavern excavating technique of the Xiaoguanzi hydropower station s underground power house;
小关子电站地下厂房洞室开挖技术
3.
The fire fighting facilities for the main mechanical and electrical equipment of underground power house in Ertan Hydropower Station;
二滩水电站地下厂房主要机电设备的消防设施
6) underground power station
地下厂房
1.
Approximate calculation of seepage discharge from drainage system of underground power station;
地下厂房洞室群排水系统渗流量的粗略估算方法
2.
Acceleration amplification region and dynamic tensile region of Tianlonghu underground power station are studied using 3-D finite element seismic analysis.
上述结果为最终确定地下厂房方案 ,优化布置方案提供了设计参考依
3.
And the seepage field of underground power station of Baise hydroproject is calculated in detail and some evaluations and suggestions are put forword on the design mesure of seepage control of the part of the power station.
采用固定网格求解有自由面渗流问题的结点虚流量法和排水孔改进排水子结构技术 ,精细模拟了排水孔、幕中众多排水孔的孔径、孔距、孔深及排水降压渗流行为 ,自动判别排水孔是否穿越渗流自由面 ,对百色水利枢纽地下厂房区 (地面升压站方案 )的渗流场进行了详细的计算分析 ,并对厂区渗控设计方案提出了评价和建议。
补充资料:主厂房
主厂房
main hall of power house
zhojehongfor、g主厂房(main hall of power house)安装水轮机、发电机及其附属设备的发电车间。它由主机间和安装间组成,是水电站厂房的主要部分,其空间尺寸要满足机组运行、检修、安装的需要,其结构应具有足够的强度、刚度及抗渗、抗冻、抗水流泥沙冲蚀能力。主机间高度大,一般分为若干层,通常最上一层为发电机层,发电机层楼面以上空间称为机房;水轮机蜗壳顶板至发电机层楼板之间的楼层,称为水轮机层,水轮机层以下的布置因装设的水轮机组的类型而异(见水电站厂房)。安装间上部空间的尺寸要与主机间上部空间协调一致,以便起重机行驶。 主厂房的结构一般分为上部结构、下部结构、中部结构。通常把发电机层以上结构称为上部结构,以下称为下部结构。主机间上下游墙内的二期混凝土如发电机支承结构、钢蜗壳的外围混凝土、发电机风罩等称为中部结构。 地面式厂房的主厂房分为:①户内式。主厂房具有上部围护结构,最高尾水位以上开设有门窗,可自然采光和通风,室内环境条件好。②封闭式。当水电站下游水位高.变幅大,又不宜将主厂房上部结构抬高到最高设计洪水位以上,为避免洪水淹没厂房而采用封闭式。这类厂房的对外交通通常采用隧洞或竖井连接。③露天式。主厂房无上部结构。发电设备皆布置在发电机层楼盖以下,机组安装和大修吊装时须先揭开发电机保护罩,通常采用露天可移动的门式起重机操作,受气候变化影响较大。 主机间又称机组段。安装的水轮机可为冲击式或反击式,立轴或横轴,根据水电站的水头大小及单机容量而定。主机间空间尺寸及各层布置由机组台数,水轮机水道及发电机尺寸,起重吊装及设备维修,交通及水位变幅诸因素来确定。大中型水电站主机间的下部结构块体尺寸大,受温度变化和地基约束及不均匀沉陷等因素的影响.产生的应力较大,通常需要把主机间分成若干区段,每区段内布置l台或2台机组,各个区段之间设有变形缝和止水设施。安装间又称安装场、装配间、装配场。其面积按机组安装及大修时主要大部件摆放和修理、进厂运输车辆停车场地等需要确定。对于地面式厂房,安装间的地面高程一般要高于下游设计最高洪水位.但是也有的水电站低于下游设计最高洪水位,为了防淹,进厂交通采用隧洞下坡或其他挡水设施。安装间建基高程、下部结构尺寸、载荷情况都与主机间差别很大,岩基上厂房通常设有变形缝与主机间分开,非岩基L厂房或小型水电站也有不分缝的,安装间与主机间的下部结构是一个整体。如安装间建基面较低.从基础至安装间楼板之间有较大空间,可以布置副厂房的一部分.安置一些辅助生产设施。
说明:补充资料仅用于学习参考,请勿用于其它任何用途。
参考词条