说明:双击或选中下面任意单词,将显示该词的音标、读音、翻译等;选中中文或多个词,将显示翻译。
您的位置:首页 -> 词典 -> 混层比
1)  ratio of mixed-layer
混层比
2)  illite/smectite interlaying
伊/蒙混层比
1.
The quantitative study is conduted on the XRD data of clay minerals in 15 mudstone samples from the Well Ancan 1 in Hefei Basin,and the testing results of illite crystallinity and illite/smectite interlaying reveal the stratigraphical diagenesis degree and thermal evolution degree of the strata met by the deep well drilling.
文章对合肥盆地安参1井内15个泥岩样粘土矿物进行了X射线衍射分析,从获得的伊利石结晶度和伊/蒙混层比测试结果,揭示了该深井所钻遇地层的成岩程度和热演化程度。
3)  illite/smectite interlaying ratio
伊利石/蒙皂石混层比
4)  mixed-layer
混层
1.
In this paper, the complicated, various geological abnormality is discovered by means of the selected area electron diffraction (SAED) and high resolution transmission electron microscopy (HRTEM): (1) the regular mixed-layer structure B mS n formed by the ordered stacking of the unit layers in bastnaesite (B) and synchysite (S) of this series in different scales .
四川冕西霓石碱性花岗岩中的稀土矿物主要为钙稀土氟碳酸盐矿物系列 ,通过选区电子衍射 (SAED)和高分辨透射电子显微术 (HRTEM )研究发现该系列矿物晶体结构中广泛发育复杂多样的微观地质异常现象 ,其主要类型有 :( 1)由该系列两个端员矿物氟碳铈矿结构层(B)与直氟碳钙铈矿结构层 (S)以不同比例沿c轴方向有序堆垛形成的BmSn型规则混层结构 ;( 2 )无序堆垛形成的有序 -无序结构晶畴 ;( 3 )由堆垛层错形成的无序混层结构、氟碳钙铈矿中不同多型体间的共格连生结构和相转变等 ;( 4 )氟碳铈矿结构中的平行于 [0 0 0 1]方向的平移畴及一维无公度调制结构 ,该类调制结构可能是由于矿物中原子占位有序度的变化而形成的无序结构状态 。
5)  blending ratio
混纺比
1.
Relation between Blending Ratio and Tensile Property of Soybean Protein Fiber Blended Yarn;
大豆蛋白纤维混纺纱混纺比与拉伸性能的关系
2.
Study on sample preparation and fiber counting of the blending ratio testing of ramie/cotton blended yarn;
麻/棉混纺纱混纺比测定的制样及纤维计数研究
3.
Study on mechanic properties of bamboo pulp/cotton blending yarns with different blending ratios;
不同混纺比的竹浆/棉混纺纱线的力学性能研究
6)  blend ratio
混纺比
1.
Study on quickly test of blend ratio of cashmere and wool with computer;
用计算机快速检测山羊绒与羊毛混纺比
2.
Effect of blend ratio on the luster of the blended yarns of heteromorphic polyester;
混纺比对异形涤纶混纺纱光泽的影响
3.
Test the blend ratio of cashmere/wool yarns with SVM object extraction method;
支持向量机提取法检测羊绒/羊毛混纺比
补充资料:单层厂房预制钢筋混凝土结构安装


单层厂房预制钢筋混凝土结构安装
installation of singlelayer precast reinforced concrete structure for workshop building

daneeng ehangfong yuzhi gangjinhunningtu JiegouanZhuang单层厂房预制钢筋混凝土结构安装(instal-lation of sidglelayer preeast reinforeed eon-eretestrueture for workshoP building)按设计与施工规范要求,将单层钢筋混凝土结构厂房的构件安装、固定到设计位置上的施工作业。构件组成包括柱、吊车梁、预应力析架(屋架及托架)和屋面板。由于构件单件较重,在受到撞击或不正常外力时易发生裂缝或断裂性损坏,因而安装时需合理地选择吊点,使用吊梁,保持起吊平稳,防止构件(特别是析架)发生抖动;禁止不正常施加外力(拉力、扭力等)强行搬转和矫正。安装方式通常分为单件流水作业和综合作业两种。前者是沿厂房全长先将柱列系统构件安装好,然后安装吊车梁,再安装屋盖系统构件;后者是将某一线的柱、梁、屋盖系统构件全部安装固定后,再安装下一线。在冶金工厂施工中多采用单件流水作业。在单层多跨钢筋混凝土结构厂房安装中,应确定中间部位一个净空较高、跨度较大的跨作为基准跨,该跨安装进度应比邻跨超前2~3线,以利合理地分配误差,避免公差积累。 安装准备除按一般厂房结构安装所要求进行的各项准备外,还应做好下列工作:(1)混凝土柱一般均在现场预制,预制场地需进行夯实,防止地基不均匀下沉而造成构件损坏。(2)析架组立、张拉及灌浆养护条件的准备。(3)拓架起吊平面外刚度的核算及必要的加固措施。(4)朽架吊点、吊梁及索具的选定。(5)预制柱翻转900,以增加柱在起吊时的抗弯能力。(6)析架间距调整器具的设计。 钢筋’混凝土柱的安装柱的起吊有旋转法(起重臂杆绕柱脚旋转而逐渐吊起的操作法)和滑行法(起重臂杆不旋转只提升吊钩的操作法)两种。柱的吊点一般设在牛腿下部。吊装时,按柱身离地面的竖直情况,分为垂直吊法和斜吊法石在起重机起重能力允许的情况下,应优先采用垂直吊法。采取斜吊法时,应用卷扬机和滑轮组拉住柱脚,用辅助主机将柱吊运至杯口。当柱重超过主机起重能力时,可采用双机抬吊。一般在柱子吊点处设有吊装孔,配备专门吊具(吊装轴)进行吊装。不设吊装孔的柱可用绳索直接绑扎吊装,但需采取保护柱棱角的措施,以防柱损伤。柱插入杯口后,应用缆绳及钢楔初步找正、固定,然后用经纬仪在柱相邻的两侧复测柱的垂直度,并量测牛腿的平面标高,确认合格后即可进行永久固定。 重型钢筋混凝土柱常采取分节吊装、高空组接的方法(上、下节柱的钢筋对焊或柱外壁连接板对焊)。
说明:补充资料仅用于学习参考,请勿用于其它任何用途。
参考词条