说明:双击或选中下面任意单词,将显示该词的音标、读音、翻译等;选中中文或多个词,将显示翻译。
您的位置:首页 -> 词典 -> 桩-土-框架结构相互作用
1)  soil-pile foundation-frame interaction
桩-土-框架结构相互作用
2)  Soil-box foundation-RC frame structure dynamic interaction
土-箱基-RC框架结构动力相互作用
3)  pile-soil-structure interaction
桩-土-结构相互作用
1.
Influence of the foundation soil parameters and structural stories on the pile-soil-structure interaction;
地基参数以及结构层数对桩-土-结构相互作用的影响
2.
The mass-spring system was used to simulate foundation and subgrade;the finite element common software was used to build the whole-pile model considering pile-soil-structure interaction,the incomplete-pile model considering pile-soil-structure interaction with cutting out the pile in the original rock,the three-dimensional finite element model without considering pile-soil interaction.
本文以跨浅海水道连续桥为研究时象,采用质量弹簧体系模拟基础和地基,用有限元通用软件分别建立了该桥的考虑桩-土-结构作用的全桩模型、将基岩中桩截去且考虑桩-土-结构相互作用的截桩模型和不考虑桩-土相互作用的无桩三维有限元模型。
3.
Considering the pile-soil-structure interaction (PSSI),the formula of the downwind displacement response is derived for highrise building subjected to fluctuating wind load.
推导了高层建筑在脉动风荷载作用下考虑桩-土-结构相互作用时其顺风向风振响应的计算公式,通过算例说明桩-土-结构相互作用对结构顺风向风振响应有明显的影响。
4)  soil-pile-structure interaction
土-桩-结构相互作用
1.
Influences of soil-pile-structure interaction on seismic response of long span CFST arch bridge;
土-桩-结构相互作用对大跨度CFST拱桥地震反应的影响
2.
The substructure technique was adopted to simulate pile group with a group of springs,the grouped pile stiffness was determined with Davies method and Pushover model of soil-pile-structure interaction system was established.
文中首先应用子结构原理,将群桩基础用一组弹簧来模拟,并用Davies方法确定群桩刚度,建立了土-桩-高层框架结构相互作用体系Pushover分析模型;在此基础上,分析了均匀分布方式和依各层质量与第一弹性振型乘积比例分布等两种侧向加载模式下土-桩-结构相互作用模型和刚性地基模型的结构各性能点的加速度谱值Sa和位移谱值Sd、以及基底剪力和顶点位移等,探讨了不同地震烈度(7度、8度和9度)下两种不同分析模型间的结果差异,得到了一些有应用价值的结果。
3.
In this paper,a 3-dimensional FE model for the bridge is established with finite element program ANSYS and the soil-pile-structure interaction is simulated by use of the mass-spring model.
以此为基础对润扬悬索桥的自振特性进行了分析,重点研究了土-桩-结构相互作用因素对大跨悬索桥动力特性的影响,与现场动力测试结果的良好吻合表明了有限元分析结果的可靠性。
5)  pile-soil-structure dynamic interaction
桩-土-结构动力相互作用
1.
Finite element analysis of pile-soil-structure dynamic interaction in liquefiable site;
液化场地桩-土-结构动力相互作用的有限元分析
2.
The research of pile-soil-structure dynamic interaction is very important to improve the reliability and safety of pile foundation under dynamic loads.
桩-土-结构动力相互作用机理与工作性能研究是提高动力作用下桩基础安全性的重要基础。
3.
The seismic response analysis method of transmission tower in consideration of pile-soil-structure dynamic interaction is presented.
提出了考虑桩-土-结构动力相互作用的输电塔地震反应分析方法。
6)  soil-pile-structure interaction
桩-土-结构相互作用
补充资料:多层厂房预制钢筋混凝土框架结构安装


多层厂房预制钢筋混凝土框架结构安装
installation of precast reinforced concrete frame structure for multilayer workshop building

定.11 ~.。」:柱1一可下门- 杯形井礴11铆椒,甲丫一目一一丫 位板沙父父护科月黔今了牛’J一一确r一一土- 二黑交哪嗯浮i钊粼减图“连接板埋设件连接法 图1柱子固定示意图柱子四面的连接板和埋设件,然后进行连接板外表面 的刷油和涂装。 由于混凝土的抗弯性能所限,混凝土柱不能过长。梁和板的安装在第一节柱安装完成后,及时将对较高的多层框架柱,一般都设计成多段,在预制厂分预制梁、板安装好,以尽快形成整体框架,保持结构的节制作,运至现场后,由安装者在高空对接成整根柱。稳定。梁与柱的连接多采用柱肩梁承接式,通过梁端头这种多节柱安装的关键在于柱与柱之间对接接口的施上下两面的埋设件与柱的埋设件焊接、固定(图4)。梁工,常用的接口型式有湿式连接(图2)和连接板埋设固定后,将预应力钢筋混凝土板座落在梁上,通过将大件连接(图3)两种。(1)湿式连接法。起吊前先实地板两端下边的埋设件与梁上面的埋设件焊接在一起,量测预留钢筋接头的尺寸,将接头调直,开好坡口;将将板固定起来(图5),使框架形成一个空间刚体。如接头处的混凝土面打毛处理,在柱头上事先系3一4根此逐层依次施工,直至完成多层厂房框架结构的全部缆绳,用于调整柱子就位后的垂直度。起吊后将上下柱安装工作的钢筋接头对准,并用两台经纬仪同时测量柱子相邻丁粉可-两面的垂直度,用缆绳进行校正。垂直度合格后进行对!」下称焊接,先焊接头支承面的钢板埋设件,再焊柱子四角!华卜一,一一洲二二的钢筋和全部对接钢筋,然后复核上下柱中心的垂直1七口,杏一一.州.去盛,度,若无偏差立即支模灌浆。(2)连接板埋设件连接法。IJ}}将柱子起吊后与下柱对准就位,并用两台经纬仪同时!//~测童校正相邻两面的中心线垂直度,合格后进行焊接。
说明:补充资料仅用于学习参考,请勿用于其它任何用途。
参考词条