2) claim for extension of time
工期索赔
1.
How to claim for extension of time to the construction enterprise;
施工企业如何进行工期索赔
2.
Application of learning curve method in calculating the claim for extension of time;
熟练曲线法在工期索赔计算中的应用
3) construction period claiming
工期索赔
1.
The application of network analysis method in calculating of construction period claiming;
网络分析法在计算工期索赔中的应用
2.
It analyses the component types of the costs of the construction claim,specifically discusses the calculation methods of construction period claiming and economical claim,to make the readers have a all-round realization to the calculation of the construction claim,and gives a references to the related technology persons.
分析了施工索赔的费用组成种类,详细地论述了工期索赔和经济索赔的计算方法,以使读者对施工索赔的计算有一个较为全面的了解,可供相关技术人员参考借鉴。
4) time-limit claim
工期索赔
1.
Treatment of underground obstacle cost and time-limit claims in pile foundation engineering;
桩基工程地下障碍物费用和工期索赔的处理
6) belated claims
逾期索赔
补充资料:保险期限终止后扩展停泊期间条款
保险期限终止后扩展停泊期间条款
【保险期限终止后扩展停泊期间条款】船舶建造保险的一种附加条款。适用于保险船舶已建成,但尚未交货,在港口停泊期间的停泊保险。本款规定,对保险船舶在港口停舶期间,自船舶建造保险终止日起至预定的日期止以扩展承保。启动或使用机器、设备,一律事先按船舶保险公司的书面同意。如要使用机器,按船舶险保单及承保的办法来承保。保险费可略低于造船险费率。
说明:补充资料仅用于学习参考,请勿用于其它任何用途。
参考词条