1)  withdraw deposit before expiration
提前支取
2)  early
提前
1.
Determination of the CDW to Minimize the Weighted Number of Early and Tardy Jobs;
最小化提前/延误赋权工件数及时窗惩罚的排序问题(英文)
2.
The strongly NP-hard and polynomial time approximation scheme(PTAS) was proposed to minimize the weighted number of early and tardy jobs together with the window location penalty.
考虑多个工件在平行机上加工的生产调度问题,这些工件相互独立且有相同的交货期窗口,但交货期窗口的位置待定,其目标是最小化提前和延误的赋权工件数及交货期窗口定位费用的和。
3.
In order to eliminate hidden production and inventory problems which cause high costs, for example, waiting time, delivery time, extra labour costs, rework and order changes, manufacturers must consider scheduling problems involving not only the tardiness penalties, but also the early costs.
为了避免储存以及隐藏的额外运转带来的高费用,比如由于等待、传递、额外劳动力、重加工以及订单改变等引起的效益损失,生产商不仅考虑延误带来的惩罚还必须顾及提前完工付出的费用;此乃准时排序问题。
3)  lead time
提前期
1.
Ordering lead time decision based on Stackelberg game;
基于斯坦克尔伯格博弈的订货提前期决策研究
2.
Impacts of demand lead time distribution on bullwhip effect;
需求提前期分布对供应链牛鞭效应的影响分析
3.
Manufacturer′s delivering the goods with lead times in JIT systems;
精益方式下考虑提前期的制造商发货问题
4)  advanced detection
提前探测
1.
Taking the Dongqu Coalmine as the example, this paper introduces the causes and features of the formation of the collapsing column, analyzes on the influence of the collapsing column on the coal production, and puts forward some effective methods for the advanced detection of the collapsing column.
以东曲矿为例,介绍了陷落柱形成的原因和特征,分析了陷落柱对煤矿生产的影响,并提出对陷落柱提前探测的有效办法。
5)  look-ahead
提前预测
6)  pre-dressing
提前分选
1.
Application of pre-dressing in magnetic separation plant;
磁选厂提前分选流程的探讨
参考词条
补充资料:提前支取


提前支取


【提前支取J定期储蓄的储户在存款未到期前向银行提取全部或部分存款的行为。在存款未到期前,储户因故急需用款,可以凭存单和存款人的身份证明,经银行查验后,可办理全部或部分提前支取。利息按实际存期,不满半年,照活期利率计算,存满半年不到一年则按半年期利率计算,余类推。整存整取部分提前支取,以一次为限。零存整取、存本取息不办理部分提前支取。
说明:补充资料仅用于学习参考,请勿用于其它任何用途。