1) earliness/tardiness
提前/拖后
1.
In order to solve the problem of earliness/tardiness scheduling subjected to special process constraint on non-identical parallel machines more efficiently,a new genetic algorithm based on vector group coding method is presented.
针对非一致并行机环境下特殊工艺约束提前/拖后调度问题,设计了一个基于向量组编码的新遗传算法,此算法的编码方法简单,能有效地反映实际调度方案,即清楚地反映出每机器加工产品的代号和顺序。
2.
In order to solve non-identical parallel machine earliness/tardiness scheduling problem with different due windows,a hybrid genetic algorithm based on sectional coding is suggested.
为有效地解决不同交货期窗口下的非等同并行多机提前/拖后调度问题,设计了一种分段编码的混合遗传算法。
3.
In order to solve non-identical parallel machine earliness/tardiness scheduling problem,a hybrid genetic algorithm based on sectional extended permutation-coding scheme is suggested.
为有效地解决带有公共交货期的非等同并行多机提前/拖后调度问题,设计了一种分段扩展排列编码的混合遗传算法,使遗传编码能同时反映调度方案和公共交货期,并对其初始种群产生、交叉和变异方法也进行了研究。
2) earliness/tardiness
提前/拖期
1.
Hot rolling steel tube batch scheduling with earliness/tardiness penalties;
具有提前/拖期惩罚的热轧钢管批调度问题研究
2.
Fuzzy programming model has been established, which is then transformed into deterministic nonlinear programming model by using the algorithm of maximizing the membership function of middle value, and an effective genetic algorithm has presented to minimize the earliness/tardiness punish .
研究了具有不同交货期窗口的Flow Shop的提前/拖期调度问题,并考虑了处理时间的不确定性。
3.
This paper is concerned with single machine problem about due window, the objective function concludes earliness/tardiness penalties and additional penalties.
假设如果任务在交货期窗口内完工 ,则不受提前/拖期惩罚 ;如果在交货期窗口外完工 ,将导致提前 /拖期惩罚 。
3) earliness and tardiness
提前/拖期
1.
Single-machine scheduling model with the earliness and tardiness penalties was established under the group technology assumption.
建立了满足成组技术要求的带有提前/拖期惩罚的单机调度模型,考虑了订单达到时间不同、交货期窗口不同、机器调整时间与工件组加工顺序相关等多种情形;设计了基于基因表达式编程的多层染色体编码方案,将染色体对应于工件的优先规则公式;最后,实现了利用先进的前序基因表达式编程搜索技术求解该问题的算法,并通过实验验证了该算法的可行性和有效性。
2.
The objective of earliness and tardiness flowshop scheduling problem with multiple processors is to minimize the total earliness and tardiness cost.
多机多阶段流水车间(Flowshop)提前/拖期调度问题的目标是使工件的提前/拖期惩罚成本最小,这是一个NP完全问题,很难用一般的方法解决。
4) earliness-tardiness
提前/拖期
1.
Notes on start times of earliness-tardiness job scheduling problem with common due window on parallel machines;
公共交货期窗口下提前/拖期多机调度的开工时间问题
5) earliuess/tardiness
提前/滞后
6) earliness/tardiness scheduling
提前/拖期调度
1.
Research on earliness/tardiness scheduling about airplane ground job operation;
飞机地面作业提前/拖期调度研究