2) Dadingzishan Navigation and Hydropower Project
大顶子山航电枢纽工程
1.
Brief analysis on technology for main shaft assembling,installation and axis adjustment of bulb turbine and generator units of Dadingzishan Navigation and Hydropower Project;
大顶子山航电枢纽工程灯泡贯流式机组主轴组装、吊装及轴线调整工艺浅析
3) mine construction engineering
矿山工程项目
1.
Application of hierarchy comprehensive decision on bid evaluation in mine construction engineering;
层次综合决策在矿山工程项目评标中的应用
4) large engineering projects
大型工程项目
1.
The feasibility research on large engineering projects may have great influence on the national economy, and deep impact on the society, economy, politics and culture.
大型工程项目的可行性研究事关国计民生,对社会、经济、政治和文化有着深远影响。
5) large-scale project
大型工程项目
1.
Application of network method in power demand for large-scale projects;
网络法在大型工程项目电力使用中的应用
2.
Application of network method in power demand of large-scale projects;
网络法在大型工程项目电力使用计划中的应用
3.
The Chinese Characteristics of Large-Scale Projects Management and its Comparison with US and USSR
大型工程项目管理的中国特色及与美苏的比较
6) large-scale construction project
大型工程项目
1.
A Study on Dynamic Comprehensive Evaluation Method of Large-scale Construction Project;
大型工程项目动态综合评价方法研究
2.
The new contracting methods and their definition,characteristics,and implementation for large-scale construction projects are researched in this paper.
就大型工程项目的新型合同结构模式的内涵、特点及其实施进行研究,重点从合同结构模式对项目投资控制、进度控制、质量控制以及组织协调方面的影响说明其重要性,以期应用现代项目管理的新理论对不同合同结构模式的优缺点进行比较,提出符合当前我国大型工程项目特点的合同结构模式,并对其具体实施提出建议。
3.
The owner would make a large number of decisions during the implementation of a large-scale construction project.
作为大型工程项目组织结构最上层的业主 ,在整个项目实施过程中需要进行大量的决策 。
补充资料:顶子
顶子 清代礼帽顶饰,是区别官员品级的重要标志。分朝冠用和吉服冠用两种。朝冠顶子共有三层:上为尖型宝石,中为球型宝珠,下为金属底座。吉服冠顶子较简单,只球型宝珠和金属底座两部分。底座有用金的,也有用铜的,上面镂刻花纹。在底座、帽子和顶珠的中心,都钻有一个5毫米直径的圆孔,从帽子的底部伸出一根铜管,然后将红缨、翎管及项珠串上,再用螺纹小帽旋紧。顶珠的颜色和材料,按官员的品级而不同。见“顶珠”。
说明:补充资料仅用于学习参考,请勿用于其它任何用途。
参考词条