3) day-ahead purchase strategy
日前购电决策
1.
This paper presents a hybrid genetic/simulated annealing algorithm to solve the mathematic model of the day-ahead purchase strategy based on economics and security.
通过IEEE-30系统,实例验证混合遗传—模拟退火算法用于日前购电决策问题是可行的,同时与传统遗传算法比较表明,混合遗传—模拟退火算法结果较优。
4) electricity trade model
购电决策模型
5) purchase decision
购买决策
1.
This article analysed the customers'psychological demand and their purchase decision process in the dress and personal adorment consumption,at the same time,it also put forword the concrete tactics in accordance with each purchase link.
以让客价值的基本概念为出发点 ,结合顾客在服饰消费中的心理需求和购买决策过程 ,给出了具体营销的实施策
2.
By analyzing Internet consumer s purchase decision processes,this paper puts forward the important factors influencing the consumer s decision behavior and the hypotheses,and proposes an Internet consumer s purchase decision model.
通过对网络消费者购买决策过程的分析,提出了影响上网顾客决策行为的重要因素及假设,并在此基础上构建了网络消费者购买决策模型。
3.
The purpose of this study is to investigate the effects of online word of mouth information on consumer purchase decision with a between-subjects factorial design.
本文通过实验法考察了网络口碑信息对消费者购买决策的影响,就网络口碑的影响力在口碑信息类型、传播方向和产品涉入度不同的情况下会表现出哪些差异等问题作了分析。
6) P&A decision-making
购并决策
补充资料:厂用电受电
厂用电受电
energizing of auxiliary power system
chongyongd一on sho一Jd一on厂用电受电(energizing of auxiliary powersystem)机组附属设备安装完毕后需通电试运行,所需厂用电源由外部供给,因此厂用电受电是调试工作开始的标志。 受电步骤新建电厂先由电力系统向变电站供电,再依次对高压起动/备用变压器、3~10kv厂用配电装置、厂用工作变压器及380V配电装置供电。扩建电厂因高压起动/备用变压器已经投人运行,故可利用它的电源对扩建的厂用配电装置等供电。 调试项目主要有:①用额定电压依次对空载线路、变电站母线、隔离开关、断瘩器、互感器、变压器及厂用配电装置等进行冲击合闸试验。有条件时.冲击合闸前应先进行递升加压试验。升压过程中注意检查各设备有无放电声及短路现象,发现问题及时处理后再进行升压。②检查三相电压应平衡,相序应正确,各段母线的相位彼此应一致。对配电装置供电时,有时会由于母线电容和与母线连接的电磁式电压互感器的电感相互作用而出现铁磁谐振,此时相电压升高,中性点明显位移。为消除谐振可在电压互感器的剩余电压绕组处并联电阻以去振。
说明:补充资料仅用于学习参考,请勿用于其它任何用途。
参考词条