1) construction timing
建设时机
1.
Theory and Methodology of Construction Timing for Rail Transit Projects;
城市轨道交通建设时机理论与方法研究
2.
Considering uncertainty,irreversibility,flexibility and public characteristics of rail transit investment,a real option model with stochastic variables for determining construction timing of rail transit projects is presented.
考虑到城市轨道交通投资的不可逆性、不确定性、灵活性和公益性,提出城市轨道交通项目建设时机选择的实物期权随机变量模型。
3) construction sequence
建设时序
1.
According to the municipal sewage collection system planning and implementation of Yuyao City,this paper suggests that while working out a planning,the present sewerage situation,urban planning,construction sequence of roads and pipelines etc.
介绍了余姚市城区污水收集系统规划的编制情况,提出在规划编制过程中应充分考虑排水现状、城市规划情况、道路及管道建设时序等,以使规划做到近、远期结合,具有较强的可操作性。
4) time-to-build
建设时间
1.
Using asymmetric options duopoly game model,the asymmetry in the cost of the investment on the basis of the introduction of construction time asymmetry,by a reverse way constructs real option asymmetric duopoly game model under time-to-build and investment cost.
运用不对称双寡头期权博弈模型,在投资成本不对称的基础上引入建设时间不对称,采用逆向归纳法导出建设时间和投资成本同时不对称的双寡头企业投资期权博弈模型;对存在的抢先均衡、序贯均衡和同时投资均衡进行分析讨论,投资均衡分析表明,建设时间和投资成本都会对企业投资策略产生影响,对于每个企业而言能否成为领先者以及何时投资要视建设时间和投资成本的相对优劣势等具体情况确定,但努力建立建设时间和投资成本的相对优势会给企业带来更多投资先机;进一步分析建设时间和投资成本对投资策略的影响显示,与建设时间相比,投资成本对企业的投资临界值影响更大,因此企业应花费更多精力通过降低投资成本获得竞争优势。
2.
This paper extends symmetrical duopoly real option timing game model under uncertainty by introducing a time-to-build,analyzes the influence of time-to-build on firms investment decision and investment cascades.
本文在对称双头垄断时机选择期权博弈模型基础上引入了建设时间变量并进行了扩展,对企业研发投资策略均衡进行了分析。
5) computer room construction
机房建设
1.
Connecting with the practice, this paper expounds some matters needing attentions in computer room construction from the aspects of field factor, general distribution, environmental requirement and management and maintenance, and advances some solving methods.
结合实际,着重从图书馆机房建设的场地因素、整体布局、环境要求、管理维护等方面,阐述了机房建设要注意的事项,并提出相应的解决办法。
6) Organization construction
机构建设
1.
In the process of establishment technical center of enterprise some questions consisted of leader attention,investment, training qualified people, organization construction and development strategy, etc have need to solve well.
企业在技术中心建设过程中,应注意解决好领导重视、资金投入、人才培养和激励,以及机构建设和发展战略等问题。
补充资料:《必须把思想政治建设摆在全军各项建设的首位》
《必须把思想政治建设摆在全军各项建设的首位》
Ideological and Political Building Must Be Put in the First Place in Building the Army from All Respects
Bixu Ba Sixiang Zhengzhi Iianshe BaizaiQt1Qnlun GeXiang Jianshe de Shouwei《必须把思想政治建设摆在全军各项建设的首位》(勿eozo、ieaz。n、尸。21,iealBuilding Must Be Puti凡t人e First Plaeei矛飞Building theA月刀〕户口从All ResPects)江泽民1994年12月18日在中央军委扩大会议上讲话的一部分,约6 800字,收人解放军出版社1997年7月出版的《军队高中级干部理论学习读本》一书。 该文的主要内容是二 要从战略的高度来认识在改革开放和发展社会主义市场经济的新形势下,加强全党全军的思想政治建设,防止腐朽思想文化侵蚀的重大意义该文指出,改革开放是一场新的革命。这场革命给社会思想文化带来了空前广泛而深刻的影响,使人们摆脱了那些陈旧过时的思想禁锢,产生了一些符合时代发展要求的新观念,极大地调动了广大群众的积极性。这是今天人们思想的主流。地方是如此,军队也是如此。但是也应看到,随着改革开放的不断扩大,资本主义腐朽思想文化乘机而人,同历史上遗留下的剥削阶级的腐朽思想文化相结合,使得当前社会上拜金主义、极端个人主义和腐朽生活方式等消极现象有所滋长,对人们的理想、信念和价值观产生了很大的冲击,也侵蚀了一部分党员和领导干部。在改革开放的历史洪流中,既造就了一大批建设有中国特色社会主义事业的新人,也可能淘汰一些意志薄弱者。要从战略的高度来认识在改革开放和发展社会主义市场经济的新形势下,加强全党全军的思想政治建设,防止腐朽思想文化侵蚀的重大意义。对于思想文化领域斗争的长期性和复杂性,一定要有足够的估计,始终保持应有的警惕。 该文指出,军队同社会有着千丝万缕的联系,各种社会思潮和社会风气也会不同程度地反映到军队中来。军队的风气总的说是好的,官兵的精神面貌是健康向上的,但是社会不良风气在部队中也有这样那样的表现,一些官兵已经受到了腐朽思想文化的侵蚀。中国人民解放军是人民民主专政的坚强柱石,不仅在政治上要十分坚定,始终不渝地坚持正确的政治方向,而且在思想道德方面也必须保持纯洁,成为人民群众学习的榜样。
说明:补充资料仅用于学习参考,请勿用于其它任何用途。
参考词条