1) the pipe jacking construction technology
顶管施工技术
1.
As a modern laying pipe jacking technics, the pipe jacking construction technology has much advantage.
顶管施工技术作为一种现代化的管道敷设施工方法,具有很多优点。
2) underground butt joining for pipejacking
顶管施工地下对接技术
3) The measurement technology of pipe jacking construction
顶管施工测量技术
4) incremental launching construction technology
顶推施工技术
1.
Combined with practical work,from technological process,erection of consolidation platform and incremental launching platform,fabrication and installation of slide rail,field assembly of steel box beam and other aspects incremental launching construction technology of steel box beam is introduced in order to provide references for similar works.
结合工程概况,从顶推施工工艺流程、钢箱梁拼装平台及顶推平台搭设、滑道制作安装、钢箱梁现场拼装、钢梁顶推及落梁等方面介绍了主桥钢箱梁的顶推施工技术,以供类似工程参考借鉴。
5) crest enters the method construction technique
顶进法施工技术
6) jacking construction
顶管施工
1.
The jacking construction steps of polluted water main tube net project of Sanxiang town Zhongshan city;
中山市三乡镇污水主干管网工程顶管施工措施
2.
In the combination with project example the paper states the destruction phenomenon of roads along lines due to the jacking construction of urban sewers.
结合工程实例,阐述由于城市污水管道的顶管施工导致沿线道路产生的破坏现象,分析了破坏的原因,提出了具体的处理方法并总结经验教训。
补充资料:施工企业技术组织措施计划(见施工企业技术)
施工企业技术组织措施计划(见施工企业技术)
technical and organize measurement plan in construction enterprise
施工企业技术组织措施杯茹”岑,~‘_:_,organize measurement plan in eonstruetionenterPrise)见施工企业技米管理基本制度。
说明:补充资料仅用于学习参考,请勿用于其它任何用途。
参考词条