1) track laying and bridge erecting
铺轨架桥
1.
The most grade of the JINJUN railway is is 17%, It pertains to the construction techniques and proceeding of track laying and bridge erecting of the high-speed railway.
我国目前铺轨架桥施工设备的爬坡能力和制动能力在设计制造时仅按12‰考虑,因此现有的铺架设备在爬坡能力、制动能力和施工安全方面均不能胜任17%。
2) bridge building and rail laying machine
架桥铺轨机
1.
The main structure,technical parameters and use of the “Changzheng” Ⅲ type bridge building and rail laying machine car are described.
介绍了《长征》 型架桥铺轨机车辆的主要结构、技术参数、用途 ,并对该车运用中的情况进行了分析总结并提出了改进建
4) track laying gantry
铺轨龙门架
5) light rail viaduct
轻轨高架桥
1.
Contrast analysis of two computing results of a certain light rail viaduct;