3) techniques of track laying and bridge erection
铺架技术
4) bridge construction technology
桥梁施工技术
5) erecting beam construction
架梁施工
1.
Oblique erecting beam construction of Xizhi River Bridge in Guang-hui express highway;
广惠高速西枝江大桥斜交架梁施工
6) construction technology with support
有支架施工技术
1.
Combined with the construction of 100 m-span reinforced concrete arch bridge in Chongqing stage of Hu-Cheng highway,this topic introduces the technology of the assembling and the pouring by using the cable-crane,and the construction technology with support of using the permanent steel arch as the main arch ring support.
结合沪成高速公路重庆段多处100 m跨钢筋混凝土拱桥的施工,介绍了100 m跨钢筋混凝土拱桥采用缆索吊机组装浇筑、常备式钢拱架作为主拱圈支架的有支架施工技术,为其他类似施工提供了参考。
补充资料:施工企业技术组织措施计划(见施工企业技术)
施工企业技术组织措施计划(见施工企业技术)
technical and organize measurement plan in construction enterprise
施工企业技术组织措施杯茹”岑,~‘_:_,organize measurement plan in eonstruetionenterPrise)见施工企业技米管理基本制度。