1) Ⅲ-phase closure of TGP
三峡三期截流
2) Three-gorges Project
三峡截流
1.
The chances and developing strategies of tourism in Shennongjia after the Three-gorges Project;
三峡截流后神农架旅游业的机遇与发展策略
3) third-phase river closure
三期截流
1.
In accordance with the preliminary design, the third-phase river closure will be achieved at the Three Gorges project during the period of the first ten days of December 2002.
按照初步设计要求,三峡工程将于2002年12月上旬实施三期截流。
4) second-phase works
三峡二期
1.
The towerbelt cranes, as a main tool, have been used for concrete placement of the second-phase works at the Three Gorges project.
三峡二期主体工程浇筑手段以塔带机为主 ,为适应浇筑强度高、入仓速度快的特点 ,已推行混凝土单元工程施工组织设计 (以下简称仓面设计 )。
5) Three-Gorges Valley
三峡流域
1.
Relationship Between Algal Growth and Nutritious Materials Absorbability in the Three-Gorges Valley;
根据三峡库区流域的实测数据和描述富营养污染流域中水华暴发强非线性耦合动力学模型中的控制函数,研究了缓流态水体环境中藻类生长的内在机制,并以长江三峡流域优势藻类,即绿藻的生长为例,较为系统地研究了藻类生长对N、P的吸收与水体中N、P浓度之间存在的强相互作用;藻类对营养物的吸收率ωi与水体中营养物浓度cx的比值(ωi/cx)不仅反映出三峡水域中藻类浓度对藻类吸收营养物程度的影响,而且在藻类生长与吸收各种营养成分之间还存在明显的关联性。
6) three phase work of the dam
三峡三期大坝
补充资料:长江三峡工程之一——长江截流
长江三峡工程之一——长江截流
长江三峡工程之一——长江截流 孙树清摄
说明:补充资料仅用于学习参考,请勿用于其它任何用途。
参考词条