2) measures in raising the speed
提速措施
1.
It introduces some measures in raising the speed, analyses the relationship between the raising of speed for passenger trains and upgrading of the signalling and communication system and it further details the general direction and concrete problems of railway signallin.
论述了提高旅客列车速度对改善运输服务和经营管理、节约投资、推动铁路科技进步的现实意义,介绍了一些国外铁路的提速措施,分析了提高旅客列车速度与铁路信号通信系统改造的关系,提出了铁路信号系统改造的总方向和若干具体问题。
4) fast construction
快速施工
1.
Study on fast construction technology of Dahuashui RCC High-thin Arch Dam;
大花水碾压混凝土高薄拱坝快速施工技术研究
2.
Study on Fast Construction Technology for Moxi NO.2 Tunnel;
磨溪二号铁路隧道快速施工技术研究
3.
Research on Fast Construction and Numerical Simulation of Settlement for High Embankment;
高填路堤快速施工及沉降的数值仿真研究
5) rapid construction
快速施工
1.
Study on potential probing system for rapid construction of vertical shaft;
立井井筒快速施工挖潜的系统研究
2.
Analysis of the mechanical effect on rapid construction of super-long soft surrounding rock tunnel with high water content;
特长富水软弱围岩隧道快速施工力学效应
6) quick construction
快速施工
1.
Concrete quick construction for shifting the temporary ship-lock to silt sluice in the Three Gorges Project;
三峡临时船闸改建冲沙闸项目混凝土快速施工
2.
Futhermore,the experiences of quick construction of tunnel are accumulated.
在台缙高速公路长石隧道工程施工中,根据不同围岩的地质条件,采用较经济可行的施工方法和技术措施,积累了隧道快速施工的经验。
3.
Introduce quick construction technology of reinforced concrete oblong assembly culvert following “protecting permafrost soil” principle—winter construction.
介绍多年冻土区拼装式钢筋混凝土矩形涵洞快速施工技术,按照保护多年冻土的原则,选择寒季施工。
补充资料:施工企业技术组织措施计划(见施工企业技术)
施工企业技术组织措施计划(见施工企业技术)
technical and organize measurement plan in construction enterprise
施工企业技术组织措施杯茹”岑,~‘_:_,organize measurement plan in eonstruetionenterPrise)见施工企业技米管理基本制度。
说明:补充资料仅用于学习参考,请勿用于其它任何用途。
参考词条