1.
Study on Fast Construction Technology for Moxi NO.2 Tunnel;
磨溪二号铁路隧道快速施工技术研究
2.
Research on Rapid Construction and Settlement Control of High Filled Subgrade;
高填方路基快速施工与沉降控制研究
3.
Research on the Highway Tunnel Rapid Construction Management Using the Inclined Shaft
公路隧道利用斜井快速施工组织研究
4.
Exploration on Application of Safe and Quick Construction Technology to Large Diameter Deep Shaft
大直径深立井安全快速施工技术探讨
5.
Rapid Construction Technology for Auxiliary Shaft in Super-thick Hard Rock in Babao Mine
八宝煤矿副井超厚硬岩快速施工技术
6.
The Simple Study of Rapid Construction of Auxiliary Shaft in EightBao Coal Mine
八宝煤矿副井井筒快速施工作业浅析
7.
Rapid Construction Methods of Welling 148m Monthly in Vertical Shaft in Dongtong
东同立井月成井148m快速施工方法
8.
Discussion on the Rapid Construction Technology for Dabieshan Tunnel
大别山隧道快速施工技术及问题探讨
9.
Fast Construction Technique of Fu-tang Hydropower Station Surge Tank Project;
福堂水电站调压井工程快速施工技术研究
10.
The theory and technology of enclosure dust-laying model in speeded advance of coal road
煤巷锚掘快速施工的封闭控尘理论与技术工艺
11.
Research on the rapid construction scheme for the Longtan high RCC dam
龙滩高碾压混凝土坝快速施工方案研究
12.
Introduction to the Management of Rapid Construction in Extra Long Tunnel under Hard Rock by Parallel Adit Drilling and Blasting Method
浅谈硬岩特长隧道平导钻爆法快速施工的管理
13.
MODEL OF A COMPLETE SET OF MACHINERY DURING RAPID CONSTRUCTION OF PARALLEL GUIDING ADIT AT EAST QINLING TUNNEL
东秦岭隧道平导快速施工机械设备配套模式
14.
The Study on Quick Construction Technology of Aquiferous Soft Surrounding Rock of Long Tunnel;
富水软弱围岩特长隧道快速施工技术研究
15.
Research on the Fast-Speed Construction Technology of Precast-Slab for Tunnel Invert;
隧道仰拱(铺底)预制板快速施工技术研究
16.
The Economical Evaluation Research and Construction Technique Scheme of Long Tunnel with Large Section;
长大隧道快速施工的技术方案及经济评估研究
17.
Research on Fast Construction and Numerical Simulation of Settlement for High Embankment;
高填路堤快速施工及沉降的数值仿真研究
18.
The In-situ Experimental Study about Fast-speed Construction Technology of Tunnel Invert;
隧道仰拱快速施工技术的现场试验研究