3) submerged depth
淹没深度
1.
On the basis of fuzzy theory and its method, the fuzzy multi hierarchy evaluation models are proposed and used to evaluate the decision of submerged depth of arch bridge.
应用模糊理论和方法提出多层次评价模型 ,利用该模型对拱桥洪水淹没深度决策问题进行综合评价 。
2.
Its submerged requirement is overtopped lockage, thus submerged depth unnecessary for upstream surface over the top of inlet.
对于斜管式进水口倒虹吸管,进口闸室流态类似于宽顶堰,其淹没要求是过闸水流淹没,而不必要求上游水面在进口管顶以上有多少淹没深度,在满足过闸水流淹没的条件下,上游水面可能高于管进口顶缘,也可能低于管进口顶缘。
4) critical submerged criterion
临界淹没度
1.
Based on the basic principle of mathematics and mechanics, a critical submerged flow for camel hump weirs is studied,and a theoretical formuls of critical submerged criterion (hs/ H0)cr for camel hump weirs is presented.
本文从数学力学原理出发,对驼峰堰淹没流态判别进行探讨,得到了驼峰堰临界淹没度(hs/H0)cr的理论计算式,可供实际工程参用。
5) Degree of submergence of weir crest
堰顶淹没度
6) minimum submerge depth
最小淹没深度
补充资料:水库淹没界线测量
测设移民线、土地征用线、土地利用线、水库清理线等各种水库淹没、防护、利用界线工作的总称。这些界线以设计正常蓄水位为基础,结合浸没、坍岸、风浪影响等因素综合确定,根据需要测设其中的一种、几种或全部。测设时,用界桩在实地标出其通过的位置并绘在适当比例尺的地形图上,作为移民规划、迁移安置及库区建设的依据。界桩分为永久桩和临时桩两类。界线通过厂矿区或居民点时,在进出处各设一个永久桩,内部每隔若干米测设一个临时桩,主要街道标出界线通过的实际位置。大片农田及经济价值较高的林区,一般每隔2~3km测设一个永久桩,再以临时桩加密到能互相通视。只有少量庄稼的山地,可只测设临时桩显示界线通过的位置。经查勘确定不予利用的永久冻土地、大片沼泽地、陡峭坡地等经济价值很低的地区,可不测设界桩。界桩测设工作由测量人员配合水库设计人员和地方、移民等有关单位协同进行,用水准仪或经纬仪分段按设计高程在实地标定,随测随将界桩及标志移交地方保管。
说明:补充资料仅用于学习参考,请勿用于其它任何用途。
参考词条