1) flood
[英][flʌd] [美][flʌd]
淹没
1.
A New DEM-based Method for Flood Area Calculation and Damage Evaluation;
一种基于数字高程模型DEM的淹没区灾害评估方法
2.
Based on grid of DEM, we take the lower reaches of Weihe flood data as a basis, and combined with Virtual GIS module of ERDAS 8.
基于数字高程模型的栅格结构,以渭河下游洪水淹没数据为基础,依据无源淹没和有源淹没的原理,并结合ERDAS8。
3.
Correct flood simulation of intertidal zone is crucial to marine applications such as coastal management and anti-flood.
此文针对传统算法的不足,提出了一种顾及高水位影响的潮滩淹没动态仿真算法。
2) inundation
[英][,inʌn'deiʃən] [美][,ɪnʌn'deʃən]
淹没
1.
②The size and inundation of the reservoir can be expounded and proved through economic benefits.
②水库规模与淹没问题,应通过经济论证。
3) submergence
[英][səb'mə:dʒəns] [美][səb'mɝdʒəns]
淹没
1.
This paper presents the experiential study on casingcutting with abrasive water jet under conditions of nonsubmergence, submergence and ambient pressure.
针对石油工程生产需要,在非淹没、淹没以及有围压存在的条件下,对磨料射流切割油井套管进行了实验研究。
4) submerged
[英][səb'mə:dʒd] [美][səb'mɝdʒd]
淹没
1.
2-D depth-averaged model for flows in river with submerged groins;
天然河道淹没丁坝群水深平均平面二维数学模型研究
2.
Simulation study of organ pipe nozzle submerged water jet;
风琴管喷嘴淹没射流流场仿真研究
3.
The submerged tunnel is simulated by the Elastic-Plastic FEM to analyse its influence on the environment.
为了分析淹没坑道对环境的影响,采用弹塑性有限元法对被淹没的坑道进行了数值计算,分析了不同情况坑道衬砌及围岩的破坏变形情况,同时提出了相应的加固方案,并对拟采用的不同方案加固效果进行了模拟分析,分析结果表明所提出的加固方案可行。
5) flooding
[英]['flʌdiŋ] [美]['flʌdɪŋ]
淹没
1.
We present an improved watershed transform based on morphological reconstruction and flooding by the analysis of the reasons of over-segmentation produced by watershed and the possible under-segmentation due to watershed-plus-marker.
针对分水岭变换产生的过分割问题以及标记点选取可能导致的欠分割问题,提出了一种基于变换序列滤波和梯度淹没的分水岭变换算法。
6) submerge
[英][səb'mɜ:dʒ] [美][səb'mɝdʒ]
淹没
1.
The rock broken mechanism and broken ability of water jet under the high pressure submerged down the hole were studied.
研究处在钻孔底高压淹没条件下,水射流的碎岩机理和碎岩能力。
补充资料:水库淹没界线测量
测设移民线、土地征用线、土地利用线、水库清理线等各种水库淹没、防护、利用界线工作的总称。这些界线以设计正常蓄水位为基础,结合浸没、坍岸、风浪影响等因素综合确定,根据需要测设其中的一种、几种或全部。测设时,用界桩在实地标出其通过的位置并绘在适当比例尺的地形图上,作为移民规划、迁移安置及库区建设的依据。界桩分为永久桩和临时桩两类。界线通过厂矿区或居民点时,在进出处各设一个永久桩,内部每隔若干米测设一个临时桩,主要街道标出界线通过的实际位置。大片农田及经济价值较高的林区,一般每隔2~3km测设一个永久桩,再以临时桩加密到能互相通视。只有少量庄稼的山地,可只测设临时桩显示界线通过的位置。经查勘确定不予利用的永久冻土地、大片沼泽地、陡峭坡地等经济价值很低的地区,可不测设界桩。界桩测设工作由测量人员配合水库设计人员和地方、移民等有关单位协同进行,用水准仪或经纬仪分段按设计高程在实地标定,随测随将界桩及标志移交地方保管。
说明:补充资料仅用于学习参考,请勿用于其它任何用途。
参考词条