说明:双击或选中下面任意单词,将显示该词的音标、读音、翻译等;选中中文或多个词,将显示翻译。
您的位置:首页 -> 词典 -> 螺丝湾电站
1)  Luosiwan Hydropower Station
螺丝湾电站
1.
Learned from the final report on direct and indirect participation in the whole process of construction management of the Luosiwan Hydropower Station, at present there are certain common problems in legal knowledge and contract reputation in cost control of hydropower construction in China.
本文说明从螺丝湾电站管理中得到的启示,影响工程造价的方方面面,设计、监理、管理、施工等单位是工程从设计、招投标、施工到竣工中不可分割的统一体,如果国家政策,改革力度不一样,各自为政,那么任何一方皆会对工程造价的控制造成影
2.
), Diqing prefectural government and provincial investment corporation, the Luosiwan Hydropower Station is the construction project, in which the Diqing Zang Autonomous Prefecture made its largest investment since the founding of the People s Republic of China.
本文结合螺丝湾水电站建设的实际情况,论述了在市场经济条件下做好螺丝湾电站建设中“三控制”的几项措
2)  Luosiwan Hydropower Station
螺丝湾水电站
1.
Treatment Measures Taken in Construction of Power Tunnel for Luosiwan Hydropower Station;
螺丝湾水电站引水隧洞施工中的处理措施
2.
Design Features of Flushing Sluice and Flood Discharging Sluice Service Tainter Gates for Luosiwan Hydropower Station;
螺丝湾水电站冲沙闸泄洪闸工作弧门的设计特点
3.
Test and Study of Surge in Surge Chamber for Luosiwan Hydropower Station;
螺丝湾水电站调压室涌浪的试验研究
3)  Manwan hydropower station
漫湾电站
1.
Countermeasures for slope perils on the left bank in Manwan Hydropower Station;
漫湾电站左岸边坡隐患及对策
2.
Analysis of the spatial-temporal characteristics of R value in the storage areas of Manwan Hydropower Station may supply good advices to prevent soil erosion effectively in local region.
根据有关降雨侵蚀力的计算方法,利用漫湾电站库区4个测站1980~2000年的逐月平均降雨资料,估算了其降雨侵蚀力R值的时空分布规律及其变化特征。
4)  Xiaowan hydropower station
小湾电站
1.
Stability analysis of high inlet slope for Xiaowan Hydropower Station;
小湾电站进水口高边坡稳定性研究
2.
In the Feasibility Report of Xiaowan Hydropower Station,construction schedule will be much slowed down due to more orifices in the dam body,reservoir filling will start 12 years later after the construction of reservoir has begun.
小湾电站可行性报告中,坝身布置的孔口大多,影响施工速度;由于大坝施工进度慢,水库在开工后的第12年汛期才能开始拦蓄洪水。
3.
Prior to the joint grouting work of the Xiaowan hydropower station,we conduct indoor and On-site slurry performance tests which provide scheme and basis for the construction.
45:1水灰比浆液对小湾电站横缝进行接缝灌浆,取得了很好的效果。
5)  Xiaowan hydropower project
小湾电站
1.
In this paper, coupling of stress and seepage fields at the damsite area of the Xiaowan hydropower project is analyzed, and the fractal effect of rock fractured surface on the seepage flow in fractured rock masses is studied by means of numeric simulation of single fracture permeability.
本文研究了小湾电站坝址区岩体渗流场与应力场的耦合相互作用 ,并结合右坝肩F1 1 断层的特性 ,探讨了裂隙内具有不同填充物情况下 ,裂隙表面分形对裂隙渗流和应力的影响。
2.
To solve the powerhouse intake high slope stability problem for the Xiaowan Hydropower Project a further comprehensive study was made based on the results of rock mass classification, sampling of soft seams, test and analysis, shearing plane network simulation and slope stability limit analysis developed in the early stage study .
围绕小湾电站厂房进口高边坡的稳定性问题 ,利用前期研究中开发的岩体分类、软弱夹层的取样、试验和分析方法、结构面网络模拟、边坡稳定的极限分析等成果 ,在进一步发展完善的基础上进行了综合研究。
6)  Manwan Power Plant
漫湾电站
1.
Analysis on the Finite Element Method of the Stress Distribution about Manwan Power Plant;
漫湾电站坝体应力场的有限元研究
补充资料:大亚湾核电站
大亚湾核电站

    中国90年代兴建的规模最大的核电站。位于广东省大亚湾畔的大坑村。由广东核电投资有限公司和香港核电投资有限公司合资建设,1984年4月动工。电站范围198万平方米,厂区占地63.5万平方米,反应堆采用法国制造的2台900兆瓦压水堆,90 厘米厚的预应力钢筋混凝土密闭安全壳可承受 5个大气压。电站装有2套各900兆瓦的汽轮发电机组,年发电量可达 100亿千瓦时。电站投产后,70%的电力供应香港,30%供应广东。1号机组于1993年8月21日并网发电,1994年2月投入商业运行。
说明:补充资料仅用于学习参考,请勿用于其它任何用途。
参考词条