说明:双击或选中下面任意单词,将显示该词的音标、读音、翻译等;选中中文或多个词,将显示翻译。
您的位置:首页 -> 词典 -> 复杂长隧洞
1)  Long complex tunnel
复杂长隧洞
2)  complex long tunnel
复杂长隧道
3)  super-long tunnel
超长隧洞
4)  long and large tunnel
长大隧洞
1.
Study on transportation system of long and large tunnel construction by TBM
长大隧洞掘进机施工洞内运输系统研究
5)  extreme-long tunnel
特长隧洞
6)  long tunnel
长隧洞
1.
According to the characteristics of tunnel boring machine (TBM) construction,which is affected by many factors and consists of complex geologic condition,the idea of introducing 3-D geological modeling technique into simulation of TBM construction was presented,and dynamic visual simulation for TBM construction of long tunnel based on 3-D geological model was studied.
针对TBM施工涉及因素众多、地质条件复杂的特点,提出将三维地质建模技术引入施工仿真,对基于三维地质模型的长隧洞TBM施工进行动态可视化仿真研究。
补充资料:导流隧洞


导流隧洞
diversion tunnel

dooll一」sLJJdorlg导流隧洞(diversion tunnel)建筑物。见导流泄水
说明:补充资料仅用于学习参考,请勿用于其它任何用途。
参考词条