说明:双击或选中下面任意单词,将显示该词的音标、读音、翻译等;选中中文或多个词,将显示翻译。
您的位置:首页 -> 词典 -> 优化设计与施工
1)  Optimized Design and Construction
优化设计与施工
2)  Design and construction improve
设计与施工优化
3)  optimum design and construction
设计施工优化
1.
Assessment of site faults of suqian third line ship lock and way of optimum design and construction;
宿迁三线船闸场地断裂评价及设计施工优化对策
4)  optimize field design
优化施工设计
5)  detailed design and construction
深化设计与施工
1.
Some thinking about detailed design and construction of mountain ash field
山谷型灰场深化设计与施工的几点思考
6)  design and construction
设计与施工
1.
The design and construction of ground anchored trough type long-line dado;
先张法预制梁地锚槽式长线台座设计与施工
2.
Saving steels material in design and construction;
浅谈设计与施工中如何节约钢材
3.
Discussion of design and construction method on extraneous prestressed strengthening technique for bridge;
公路梁桥体外预应力加固设计与施工方法研究
补充资料:施工综合进度优化


施工综合进度优化
optimization for overall schedule of construction

shlgong Zonghe jlndU youhuo施工综合进度优化(optimization for overallschedule of eonstruetion)对施工中的相关因素进行多方案比较和优选,找出最佳的进度方案并予以实施的工作。最佳的进度方案应是工期、资源利用、工程造价等方面综合考虑最优的方案。优化的方法包括工期优化法、资源优化法、成本优化法等. 工期优化法在合理利用人力、物力、财力、资源的前提下,尽量缩短关键路径所需的时间。可以采取提高机械化程度等先进施工方法,以及采用近饱和密度的施工组织措施等.近饱和密度的施工,是按流水施工的原理确定工艺参数、空间参数和时间参数,使多工种、多工序相互穿插,紧密衔接,充分利用施工场地,尽量减少施工中的停歇时间,以加快施工进度。 资源优化法在力求减少资源投人的条件下满足工期要求。有两种优化方法:①资源已定,力求工期最短;②工期已定,力求资源投人最少。 成本优化法寻找工程总成本(或工程总造价)最低的最短工期。具体方法是:将工程的直接费(随工期压缩所需增加的机械购置和使用费用、材料费用、临建费等)与工期延长所需增大的间接费进行比较,并计算工程提前投产后的发电效益等诸多因素。优化的结果,使工程成本最低,工期最短。
说明:补充资料仅用于学习参考,请勿用于其它任何用途。
参考词条