2) plant contractor
工厂承包商
3) subcontractor
[英][,sʌbkən'træktə(r)] [美]['sʌb'kɑn'træktɚ]
承包工厂
4) contractors
[英][kən'træktə] [美]['kɑntræktɚ]
承包商
1.
Views on HSE management on contractors.;
浅谈对基建承包商的HSE管理
2.
How to deal with project amount listing price risks for the contractors;
承包商如何应对工程量清单计价风险
3.
The Risking Research of Contractors in Engineering Construction Bidding Stage;
工程施工招投标阶段承包商的风险研究
5) general contractor
总承包商
1.
Study on Division of Profit and Vertical Integration of General Contractor
工程总承包商的利益分配及纵向一体化研究
2.
Compared with traditional contract models,the general contractors undertake more risks in the implementation process of EPC projects.
与传统的承发包模式相比,总承包商在EPC项目的实施过程中承担着更多的风险因素,因此,项目管理者要有强烈的风险意识,学会控制和防范风险。
3.
This paper sets up the cost models of construction industry and general contractor under the two conditions of vertical integration and non-integration.
只具有设计能力的工程总承包商要实施工程总承包项目,对自己目前缺乏能力完成的施工工作必须决策是分包给施工企业还是培育自身的施工能力。
6) main contractor
总承包商
1.
In this paper, it tries to develop the effective team organized by the main contractor and the subcontractors.
在EPC总承包模式下,总承包商与各分包商如何协作参与到项目中去,不仅直接影响到项目实施的生产率,而且对项目的质量、工期、费用和业主的满意度产生重要影响。
补充资料:核电厂厂级计算机系统
核电厂厂级计算机系统
plant computer system of NPP
比d lonehong ChongJIJ!suonJI x.tong核电厂厂级计算机系统(plant。omputer sys-tem of NPP)自动采集和处理核电厂运行过程中各种工艺参数,并对其进行分析处理,同时,通过阴极射线管(CRT)屏幕将反映核电厂运行特征和状态的数据分析处理结果(关健信息)显示给操纵人员。厂级计算机系统不直接参与工艺过程的控制,其主要任务是为操纵员提供良好的人机接口和操作环境,以提高操纵员运行操作和事故处理的工作质量。 系统组成典型的厂级计算机系统包括专门的数据采集计算机和数据处理计算机。以压水堆核电厂为例,通常配备两台电厂工艺参数和状态参数的数据采集计算机,另有一台计算机专门用来采集堆芯中子注t率实侧数据,被采集到的数据经预处理后,通过数据母线传送到厂级计算机系统。数据处理计算机通常采用双机,一台进行实时处理,一台进行分析计算,当实时处理的计算机出现故障时,另一台自动投人,承担实时处理的任务。被处理过的数据信息通过若干台彩色CRT显示或打印机愉出,各台CRT可以根据需要分别调用所需的信息,CRT的屏幕显示可以通过硬拷贝翰出,如图1所示。
说明:补充资料仅用于学习参考,请勿用于其它任何用途。
参考词条