1) contract assessment
承包考核
3) ideas of project general contracting patterns
工程总承包模式思考
4) contract
[英][kən'trækt] [美]['kɑn,trækt]
承包
1.
Safety Management Should Be Strengthened After the Tank Truck Been Contracted;
油罐汽车承包后应强化安全管理
2.
Discussion on international engineering contract management;
国际工程承包合同管理探讨
3.
Exploration and Experience about Contracting Signal Equipment Maintenance at small station;
小站信号设备承包的探索与体会
5) Contracting
[英][kən'trækt] [美][kən'trækt]
承包
1.
Influence of Overall Design-construction Contracting Tender on Projects;
设计-施工总承包招标对工程项目的影响
2.
On fund management for international engineering contracting projects
浅析国际工程承包项目中的资金管理
6) examination
[英][ɪɡ,zæmɪ'neɪʃn] [美][ɪg'zæmə'neʃən]
考核
1.
The execution of objective examination annually can promote the monitoring efficiently;
实行年度目标考核是促进监测工作发展的有效方法
2.
Discussion on clinical ability cultivation and examination for postgraduates of clinical medicine for specialty degree;
临床医学专业学位研究生临床能力培养与考核
3.
Analysis of Examination of Clinic Basic Skill for Anesthesia Intern;
麻醉系实习医师临床基本功毕业考核分析
补充资料:成本考核指标(costexammingtarget)
评价各成本中心业绩的主要依据。通过考核,可以促使各个责任中心控制和降低各项耗费,以便控制和降低各种产品的生产成本,成本考核指标主要集中于目标成本的完成情况,包括目标成本节约额是一个绝对数指标,它以绝对数来反映目标成本的完成情况,其计算公式如下:
目标成本节约额=预算成本-实际成本
目标成本节约率是一个相对数的指标,它以相对数的形式反映目标成本的完成情况。
目标成本节约额=预算成本-实际成本
目标成本节约率是一个相对数的指标,它以相对数的形式反映目标成本的完成情况。
说明:补充资料仅用于学习参考,请勿用于其它任何用途。
参考词条