说明:双击或选中下面任意单词,将显示该词的音标、读音、翻译等;选中中文或多个词,将显示翻译。
您的位置:首页 -> 词典 -> 阻尼装置受剪承载力分配率
1)  strength ratio of the damper system
阻尼装置受剪承载力分配率
2)  shear strength ratio
受剪承载力分配率
1.
In this paper , the nonlinear seismic response analysis is done on the frame without damper and the frame attached dampers floor by floor according to different shear strength ratio in order to discuss the seismic mitigation effect of hysteretic dampers.
通过参数分析得到验证,存在使阻尼器的减震效果达到最佳状态的受剪承载力分配率,其值大约为0·4~0·6,同时也表明在较大的分配率范围内阻尼器均具有明显的减震效果。
3)  shear strength
受剪承载力
1.
Experimental research on shear strength for reinforced concrete columns strengthened with CFS;
碳纤维布增强柱受剪承载力的试验研究
2.
A comparison of shear strength calculation method of RC beams was studied between Chinese Code for Design of Concrete Structures(GB 50010—2002) and American Code ACI 318M—05 based on the test results in the literatures available in China and abroad.
基于各国混凝土梁的斜截面抗剪试验结果,对中国《混凝土结构设计规范》(GB 50010—2002)与美国ACI 318M—05规范的钢筋混凝土梁斜截面受剪承载力计算方法进行了分析对比,并对最大和最小配箍率也进行了对比。
3.
Static loading tests of 35 specimens were carried out to study the shear strength of concrete filled steel tube(CFST)columns.
为建立钢管混凝土柱的受剪承载力计算式,完成了35根试件的静力加载试验。
4)  shear capacity
受剪承载力
1.
Comparison of shear capacity calculation methods in Chinese and British codes for structure design of concrete;
中英混凝土规范受剪承载力计算对比
2.
Prediction of shear capacity of prestressed concrete deep flexural members based on modified strut-and-tie model;
基于改进拉-压杆模型的预应力混凝土深受弯构件受剪承载力预测
3.
Discussion on analytical methods for shear capacity of reinforced concrete beams under biaxial bending;
钢筋混凝土双向受弯梁受剪承载力的计算方法探析
5)  shear bearing capacity
受剪承载力
1.
Calculation of shear bearing capacity of complex strengthening reinforced concrete short column
复合加固钢筋混凝土短柱的受剪承载力计算
2.
Calculation method for shear bearing capacity of RC shear wall
混凝土剪力墙受剪承载力计算
3.
Furthermore,the theory shear bearing capacity formulate is fitted using the experimental data.
本文采用统一的剪摩理论模式、极限平衡方法和能量分析方法,建立了配筋砌体受剪承载力的理论计算公式。
6)  shear resistance
受剪承载力
1.
The shear resistances of sixteen full-size(2.
对带肋钢板+石膏板双面板、单面带肋钢板、单面石膏板和双面无板带交叉扁钢拉条支撑4类墙体试件进行了无竖向力水平单调加载、无竖向力水平低周反复加载和有竖向力水平低周反复加载的试验,得到了各类墙体试件的受剪承载力指标和位移延性系数μ等性能指标。
2.
This paper adopts the finite element method(FEM)to analyze the shear resistance of websteel stud walls in residential structure.
结果表明:组合墙体的墙面板材料特性对组合墙体的受剪承载力影响非常大,随着墙架柱间距缩小、边缘自攻螺钉间距加密,组合墙体的受剪承载力明显提高。
3.
This paper adopts the finite element method(FEM) to study the shear resistance of cold-formed steel stud walls in residential structures.
采用有限元方法分析了不同墙面板材料、不同钢种、不同墙架柱间距、不同墙体高度、不同螺钉间距等参数对组合墙体承载力的影响,参数分析表明:组合墙体的墙面板材料特性对组合墙体的受剪承载力影响较大,钢材强度对组合墙体的受剪承载力影响较小;随着墙架柱间距缩小、墙体高度减小、边缘自攻螺钉间距加密,组合墙体的受剪承载力明显增加。
补充资料:劳动力人数和劳动力参与率


劳动力人数和劳动力参与率


  劳动力人数和劳动力参与率劳动力人数,一般指达到一定年龄的人口中,已参加或要求参加工作的人数。亦称经济活动人口,即能供应劳动力市场的劳动力人数。在实际统计中,通常只包括民用劳动力的人数,不包括军队人数在内。因此,具体地讲,劳动力人数,一般只包括全部就业人数(或在业人口)和失业人数两部分。 在计算劳动力的起始年龄上,各国规定不尽相同。如菲律宾规定从10岁开始,英国、日本规定从15岁开始,美国规定从16岁开始。联合国组织要求从巧岁开始统计。将劳动力人数同达到一定年龄的人口总数进行对比,称之为劳动力参与率,或叫经济活动人口比率。这个指标大体上能反映一个国家或一个地区劳动力资源的利用状况。计算公式为:劳动力参与率-巧岁(或16岁)以上劳动力人数15岁(或16岁)以上人口总数又100% 例如,美国1955年16岁以上的人口总数为179 922 000人,其中就业人数为108 856 000人,失业人数为8 312 000人。将上述数据代入公式,即得美国1985年的劳动力参与率为:108 856 000+8 312 000179 912 000又100%=65.1%
  
说明:补充资料仅用于学习参考,请勿用于其它任何用途。
参考词条