2) Wanghu Lake
网湖
1.
Study on ~(137)Cs and ~(210)Pb Dating and Sedimentation Rates of Wanghu Lake,Hubei Province;
湖北网湖~(137)Cs、~(210)Pb计年与沉积速率研究
2.
This paper deals with the age and growth of Channa argus based on 75 specimen collected from Wanghu Lake in 1997 and 1998.
网湖乌鳢的鳞径与体长关系为:L=0。
3.
oligthentis in the Wanghu Lake, Hubei Province.
研究了网湖太湖新银鱼和寡齿新银鱼的繁殖、食性和生长等生物学特性,并就网湖银鱼增殖的措施进行了探讨。
3) Hubei electric power network
湖北电网
1.
The Organization and process about the first time combined anti accident maneuver of Hubei electric power network was introduced.
介绍湖北电网首次联合反事故演习组织情况及演习过程 ;对演习中所取得的经验和所存在的不足进行分析和总
4) Hunan power grid
湖南电网
1.
Application of new-style regulative capacitor in series compensation AC de-icing equipment in Hunan power grid
可调电容串联补偿式交流融冰装置在湖南电网的应用
2.
In January 2008,major disaster caused by icing and snowing happened in some regions of Central China and South China,and in this severe icing and snowing disaster Hunan power grid is particularly suffered.
作为此次调研的总结,文章论述了湖南电网覆冰闪络、倒塔、断线、变电设备受灾等情况,并总结了冰灾中采取的措施。
3.
The situation of icing damage appeared in Hunan power grid around the Chinese Spring Festival in the year of 2005 and its on-site sampling data are presented.
介绍了2005年春节前后湖南电网的冰灾情况及现场取样数据,结合湖南的地形特点分析了湖南易形成雨雪冰冻天气的原因及其特点,对220kV、500kV线路发生倒塔断线的区段(点)进行了微地形特征统计分析和倒塔原因分析,根据“避、抗、融、改、防”五字综合技术措施提出了已建线路和新建线路防冰灾事故的应对措施,同时指出为及时掌握电线的结冰情况应积极开展红外仪观测系统和远程信息传输系统的研究。
5) Wanghu Sluice
网湖闸
1.
Post-grouting technique around cast-in-situ piles in soft foundation of Wanghu Sluice;
灌注桩后压浆技术在网湖闸软基处理中的应用
6) Hubei power grid
湖北电网
1.
Development and prospect for the Hubei Power Grid Dispatching Automation;
湖北电网调度自动化系统的发展与展望
2.
Experiences and Lessons in the Safe and Stable Operation of Hubei Power Grid;
湖北电网安全稳定运行的经验和教训
3.
Suggestions About Hubei Power Grid 1999~2010 Main Network Construction;
湖北电网1999~2010年主网建设几点设想
补充资料:城域网(见计算机网络)
城域网(见计算机网络)
metropolitan area network, MAN
ehengyuwQng城域网(metropolitan area netwo次,MAN)分布范围可覆盖几个街区到整个城市的计算机网络。见计算机网络。
说明:补充资料仅用于学习参考,请勿用于其它任何用途。
参考词条