1)  Bone tissue engineering
有组织工程
2)  private group
私有组
3)  organized
有组织
1.
The Characteristics and present situation of Chinese government organized S&T activities are analyzed in this paper.
本文在分析我国政府有组织科技活动现状和特点的基础上,提出建立绩效评价制度是提高我国政府有组织科技活动效率和产出的重要手段,及建立我国政府有组织科技活动绩效评价制度的初步框架及实施建议。
2.
Transnational crime is the case, especially the transnational organized crime makes a great deal damage to many countries, and it brings up mishap for all human beings.
随着全球经济的一体化,世界各国之间的经济、文化交往越来越频繁,这在促进经济和社会发展的同时,也带来了新的社会问题,其中跨国犯罪,特别是跨国有组织犯罪,给许多国家造成了很大的危害,也给整个人类带来了灾难。
4)  common active constituents
共有组分
1.
Comparison analysis of common active constituents,between recipe Jingfangsan and its single herbs Herba Schizonepetae(HS) and Radix Saposhnikoviae(RS),was performed by GC?MS and the method of alternative moving window factor analysis(AMWFA).
利用GC/MS法分离检测荆防散、单味药荆芥和防风的活性挥发油成分,采用交互移动窗口因子分析法(AMWFA)对药对与单味药活性挥发油成分的共有组分进行解析、定性,采用总体积积分法定量。
5)  rich system
富有组
6)  organized medium
有组织介质
参考词条
补充资料:承包人要求发包人组织工程验收,包括隐蔽工程的验收和工程竣工的验收的权利
承包人要求发包人组织工程验收,包括隐蔽工程的验收和工程竣工的验收的权利:根据我国《合同法》的第278条规定隐蔽工程在隐蔽以前,承包人应当通知发包人检查。发包人没有及时检查的,承包人可以顺延工程日期,并有权要求赔偿停工、窝工等损失。根据《合同法》第279条中的规定建设工程竣工后,发包人应当根据施工图纸及说明书、国家颁发的施工验收规范和质量检验标准及时进行验收,因此在工程完成时组织竣工验收,也是发包人的主要义务。建设工程竣工验收合格后,方可交付使用,未经验收或者验收不合格的,不得交付使用,发包人对未经验收的工程,提前使用或者擅自动用的,对发现的质量问题由发包人自行承担责任。-------------《民法》第一版,第514页。魏振瀛;《合同法》的第278条
说明:补充资料仅用于学习参考,请勿用于其它任何用途。