说明:双击或选中下面任意单词,将显示该词的音标、读音、翻译等;选中中文或多个词,将显示翻译。
您的位置:首页 -> 句库 -> 地下主厂房
1.
CFD Simulation of Air-Distribution in Underground Main Plant Room of Dagangshan Hydroelectric Station;
大岗山水电站地下主厂房气流的CFD模拟
2.
NUMERICAL SIMULATION OF CONSTRUCTION VENTILATION IN THE UNDERGROUND POWERHOUSE
水电站地下主厂房施工通风动态数值模拟
3.
3D parametric design method for underground powerhouse of hydropower engineering
水电工程地下主厂房三维参数化设计方法
4.
Ventilation Model Experiment and Numerical Study of XiLong Chi Hydropower Station s Underground Houses;
西龙池水电站地下主厂房通风模型试验与数值模拟研究
5.
Model Experiment and Study on Thermal Properties of the LangYa-Mountain Hydropower Station s Underground Powerhouses;
琅琊山抽水蓄能电站地下主厂房热环境特性的模型试验与研究
6.
Ventilation Model Tests On HHHT Pumped-Storage powerhouse busbar layer
HHHT抽水蓄能电站地下主厂房母线层通风模型试验研究
7.
Ventilation Model Tests with Airflow Organization Optimization on HuHeHaoTe Hydropower Station Underground Main Building: (Closed Holes and Installed Rrelay Fan)
呼和浩特水电站地下主厂房通风气流组织优化模型试验:封闭吊物孔、安装接力风机
8.
The Surrounding Rock Quality Classification of the Underground Building Main Workshop in the Hydropower;
某水电站地下洞室主厂房岩体质量分级研究
9.
A Deforming Characteristic Evaluation of Excavating Underground Hydropower Station on the Right Bank of the Three Gorges Project;
三峡地下电站主厂房开挖变形特性分析
10.
The Excavation Methods of Main-transformed Cavern of Underground Powerhouse of Baise Water Conservation Junction
百色水利枢纽地下厂房工程主变洞的开挖方法
11.
A Review on the Main Geological Problems of Underground Powerhouse of Goupitan Hydropower Station at Wu River
乌江构皮滩水电站地下厂房主要地质问题研究综述
12.
A Stability Evaluation of Excavating Underground Hydropower Station on the Right Bank of the Sanxia Project;
三峡右岸地下电站主厂房硐室开挖过程结构稳定性分析
13.
Construction control for engineering geologic body of underground power house chambers
地下厂房洞室群工程地质体施工控制
14.
Regression Analysis of Initial Geostress Field for Underground Workshop Area;
地下厂房区初始地应力反演回归分析
15.
Seismic response of main building structure of refuse incinerating power plant
垃圾焚烧工程主厂房的地震反应分析
16.
Construction of rock abuttal for bridge crane in an underground pumped storage power plant
“广蓄”电站地下厂房岩壁吊车梁施工
17.
The Numerical Simulation of Air Distribution of the Underground Main Workshop in a Hydropower Station;
地下电站高大厂房气流组织数值模拟
18.
Construction Numerical Simulation of Cavern Group in Underground Hydropower House;
水电站地下厂房洞室群施工数值仿真